Stargazer BESS (ERCOT-25INR0556) — Project Summary

Queue ID
ERCOT-25INR0556
Capacity
104.5 MW
Technology
Solar+Battery
Status
suspended
Location
Brazoria, TX
Region
ERCOT
Developer
Stargazer Solar LLC
IA Status
Facility Study

Stargazer BESS

ERCOT-25INR0556BetaSuspendedBatteryBatteryERCOTLBNL + Live

104.5 MW generation in Brazoria, TX · In queue since October 2023 · Proposed COD February 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

104.5 MW

Capacity

1

Components

Battery

3y 1m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 4m

Suspended50%
Queue EntryOct 30, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-02-01

Queue history
25INR0556 · 35 monthly ERCOT reports, Oct 2023 – Aug 2026

Projected COD moved

1 time

Dec 2025 → Feb 2027

Net change

+14 months

first report to latest

Capacity

105 MW

unchanged in the reports

Latest stage

Facilities study done

last listed Aug 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 30, 2023
Facilities study approvedMar 27, 2026
On ERCOT's inactive listSep 2026 – Sep 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Feb 2027
From queue filing
Developer in saved assessment
Aypa Power
Filed as Stargazer Solar LLC
Status at research time
Active
Active — Facility Study stage, tax abatement secured May 2024
Financing
Not recorded

Milestones in this assessment

Permit approvedMay 28, 2024Latest in this assessment

Fort Bend County tax abatement agreement executed for Stargazer BESS LLC

agendalink.fortbendcountytx.gov
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. agendalink.fortbendcountytx.gov/docs/2024/CCTDD/20240528_3892/60881_FBC_Tax_Abatement_Agreement-STARGAZER_BESS_LLC.DD.Final-signed-UL.pdf
  2. cleanview.co/power-projects/developers/aypa-power
  3. cleanview.co/planned-battery-projects/TX/25INR0556/stargazer-bess

Commercial operation date: LBNL queue snapshot shows proposed COD of February 2027. No contradicting dates found in news or search results; Cleanview aggregator shows 'January 2027' but this appears derived from same LBNL data.

Developer: LBNL filing entity is 'Stargazer Solar LLC' (project shell). Fort Bend County tax abatement documents (May 2024) reference both 'Stargazer Solar LLC & Stargazer BESS LLC'. Cleanview developer pipeline lists this project under Aypa Power's portfolio, and Aypa Power (Blackstone portfolio company) has been actively developing multiple Texas BESS projects with similar naming patterns and financing activity in 2024.

Status: LBNL shows 'Active' status in Facility Study phase. Fort Bend County tax abatement agreement executed May 28, 2024 confirms project is advancing through local permitting.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Stargazer BESS (ERCOT queue ID 25INR0556) is a proposed energy development project in Brazoria County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Stargazer Solar LLC and has a total capacity of 104.5 MW. Although it is classified in the queue as a Solar+Battery generation project, the only component listed is a 104.5 MW battery energy storage system. The project would interconnect at the WA Parish – Nash 138 kV point of interconnection (44010 WA Parish – 42980 Nash).

The project entered the ERCOT interconnection queue on October 30, 2023, and has a proposed commercial operation date of February 1, 2027. Its interconnection agreement status is listed as Facility Study, and the project's current queue status is suspended. Stargazer BESS has appeared in recent news coverage, with seven articles identified, all of them related to deals.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Aug 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Stargazer Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

44010 WA Parish - 42980 Nash 138 kV

Data Source

LBNL + Live

DeveloperAypa PowerEnergy-Storage.News · 2024-08-09
TransactionProject financingEnergy-Storage.News · 2024-08-09
Deal value$573.0MEnergy-Storage.News · 2024-08-09
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.