Stargazer BESS
104.5 MW generation in Brazoria, TX · In queue since October 2023 · Proposed COD February 2027
104.5 MW
Capacity
1
Components
Battery
3y 1m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-02-01
Projected COD moved
1 time
Dec 2025 → Feb 2027
Net change
+14 months
first report to latest
Capacity
105 MW
unchanged in the reports
Latest stage
Facilities study done
last listed Aug 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Fort Bend County tax abatement agreement executed for Stargazer BESS LLC
agendalink.fortbendcountytx.govResearch sources and reasoning (3 recorded sources)
medium confidence at research time
- agendalink.fortbendcountytx.gov/docs/2024/CCTDD/20240528_3892/60881_FBC_Tax_Abatement_Agreement-STARGAZER_BESS_LLC.DD.Final-signed-UL.pdf
- cleanview.co/power-projects/developers/aypa-power
- cleanview.co/planned-battery-projects/TX/25INR0556/stargazer-bess
Commercial operation date: LBNL queue snapshot shows proposed COD of February 2027. No contradicting dates found in news or search results; Cleanview aggregator shows 'January 2027' but this appears derived from same LBNL data.
Developer: LBNL filing entity is 'Stargazer Solar LLC' (project shell). Fort Bend County tax abatement documents (May 2024) reference both 'Stargazer Solar LLC & Stargazer BESS LLC'. Cleanview developer pipeline lists this project under Aypa Power's portfolio, and Aypa Power (Blackstone portfolio company) has been actively developing multiple Texas BESS projects with similar naming patterns and financing activity in 2024.
Status: LBNL shows 'Active' status in Facility Study phase. Fort Bend County tax abatement agreement executed May 28, 2024 confirms project is advancing through local permitting.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Stargazer BESS (ERCOT queue ID 25INR0556) is a proposed energy development project in Brazoria County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Stargazer Solar LLC and has a total capacity of 104.5 MW. Although it is classified in the queue as a Solar+Battery generation project, the only component listed is a 104.5 MW battery energy storage system. The project would interconnect at the WA Parish – Nash 138 kV point of interconnection (44010 WA Parish – 42980 Nash).
The project entered the ERCOT interconnection queue on October 30, 2023, and has a proposed commercial operation date of February 1, 2027. Its interconnection agreement status is listed as Facility Study, and the project's current queue status is suspended. Stargazer BESS has appeared in recent news coverage, with seven articles identified, all of them related to deals.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Aug 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Brazoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Stargazer Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
44010 WA Parish - 42980 Nash 138 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.