Carolina Storage Friendswood
105.08 MW storage in Brazoria, TX · In queue since February 2024 · Proposed COD March 2028
105.08 MW
Capacity
1
Components
Battery
2y 9m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 1m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Completed, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-30
Projected COD moved
3 times
Dec 2025 → Mar 2028
Net change
+27 months
first report to latest
Capacity
105 MW
unchanged in the reports
Latest stage
Facilities study done
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Original proposed completion date before being pushed to September 2027
interconnectionfyi.substack.comResearch sources and reasoning (6 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/25INR0550/carolina-storage-friendswood
- interconnection.fyi/project/ercot-25inr0550
- interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-ad5
- modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
- ercotqueue.com/project/25INR0550
- ercotqueue.com/developer/cse-storage-llc
Commercial operation date: LBNL proposes September 2027 COD. One source (interconnection.fyi) notes the proposed completion changed from December 2025 to the current 2027 date, but no independent news or press releases confirm a developer-backed target. Consensus defaults to LBNL filing.
Developer: All sources consistently identify CSE Storage, LLC as the developer. No parent company, operating entity, or ownership change information found in search results. The entity appears to be the actual developer, not a shell LLC.
Status: LBNL reports 'active' status at Facility Study stage with no IA date. Third-party queue trackers (ercotqueue.com, AWS buildout report) confirm 'No IA' and early-stage status with low build probability.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Carolina Storage Friendswood project is a proposed 105.08 MW battery storage project located in Brazoria County, Texas. Developed by CSE Storage, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0550, with a queue entry date of February 2, 2024. The proposed commercial operation date is September 30, 2027.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is TAP 138kV 39010 HASTINGS - 38980 FRIENDSWOOD. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Brazoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
CSE Storage, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
TAP 138kV 39010 HASTINGS - 38980 FRIENDSWOOD
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- MEDIUM
- POI Substation
- Hastings Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.