Kahla Storage
200.9 MW storage in Leon, TX · In queue since August 2023 · Proposed COD December 2028
200.9 MW
Capacity
1
Components
Battery
3y 3m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 4m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-29
Projected COD moved
2 times
Dec 2025 → Dec 2028
Net change
+36 months
first report to latest
Capacity
201 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Original proposed COD before being pushed to December 2028
interconnectionfyi.substack.comRevised proposed completion date as of December 2024
interconnectionfyi.substack.comResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05
- interconnectionfyi.substack.com/p/interconnectionfyi-weekly-digest
- bizapedia.com/tx/bt-kahla-storage-llc.html
- ercotqueue.com/project/25INR0513
Commercial operation date: LBNL queue shows proposed COD of 2028-12-29. One interconnection.fyi digest from Dec 2024 notes the COD was pushed from April 2026 to December 2028, confirming the current LBNL date. No developer press releases or financing announcements found to provide an updated target.
Developer: LBNL filing entity is 'BT Kahla Storage, LLC' (project LLC formed June 2023 per Bizapedia). EIA Monthly Electric Power data lists the owner as 'Belltown Power Texas 2, LLC', indicating BT is a shell entity for the Belltown parent company.
Status: LBNL shows 'active' status at Facility Study stage with no IA date. EIA confirms regulatory approvals pending and project not under construction. No withdrawal or suspension signals found.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Kahla Storage project is a proposed 200.9 MW battery storage project located in Leon County, Texas. Developed by BT Kahla Storage, LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-25INR0513. The project entered the interconnection queue on August 21, 2023, and has a proposed commercial operation date of December 29, 2028. Its interconnection status is currently in the Facility Study phase.
The Kahla Storage project is linked to the existing Kahla Storage operating plant (EIA ID 68168). The point of interconnection is Tap 345kV 46020 Limestone 967 Gibbons Creek Circuit 50. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Leon
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BT Kahla Storage, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 46020 Limestone 967 Gibbons Creek Circuit 50
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
- POI Substation
- Farrar Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.