Pearl Moon (ERCOT-25INR0511) — Project Summary

Queue ID
ERCOT-25INR0511
Capacity
208 MW
Technology
Solar
Status
active
Location
Colorado, TX
Region
ERCOT
Developer
Pearl Moon Solar, LLC
IA Status
Facility Study

Pearl Moon

ERCOT-25INR0511BetaActiveSolarERCOTLBNL

208 MW generation in Colorado, TX · In queue since September 2023 · Proposed COD April 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

208 MW

Capacity

1

Components

Solar

3y 2m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 7m

Facilities Study50%
Queue EntrySep 7, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-04-26

Queue history
25INR0511 · 29 monthly ERCOT reports, Aug 2023 – Dec 2025

Projected COD moved

2 times

Jun 2025 → Apr 2029

Net change

+46 months

first report to latest

Capacity

208 MW

unchanged in the reports

Latest stage

Cancelled

last listed Dec 2025

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 7, 2023
CancelledJan 15, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
2029
From queue filing
Developer in saved assessment
Pearl Moon Solar, LLC
From queue filing
Status at research time
Withdrawn
Withdrawn — ERCOT cancelled project January 15, 2026 per community tracking
Financing
Not recorded

Milestones in this assessment

WithdrawnJan 15, 2026Latest in this assessment

Project cancelled by ERCOT, 208 MW solar in Colorado County

facebook.com
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. interconnection.fyi/project/ercot-25inr0511
  2. renewablesinfo.org/project/ercot-25inr0511-pearl-moon
  3. facebook.com/groups/erathcountystopsolarfarmshere/posts/1826740444702302/

Commercial operation date: Only LBNL queue data provides a COD target of 2029-04-26. No news or press releases found discussing project timeline or development status.

Developer: Only LBNL filing identifies developer as 'Pearl Moon Solar, LLC'. No news coverage found to confirm parent company or operating entity. Name appears to be project-specific LLC but no parent company identified.

Status: Facebook post from February 2026 lists 'Pearl Moon Solar - Colorado - 01/15/2026 - 208.00 MW' among ERCOT cancelled projects in January 2026. Interconnection.fyi also shows status as 'withdrawn', contradicting LBNL's 'active' status which appears stale.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Pearl Moon is a proposed 208 MW solar generation project located in Colorado County, Texas. The project, developed by Pearl Moon Solar, LLC, is in the ERCOT interconnection queue as entry ERCOT-25INR0511, with a queue entry date of September 7, 2023. The proposed commercial operation date is March 31, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The Pearl Moon project consists of 208 MW of solar photovoltaic generation. The project has been mentioned in recent news coverage related to the energy industry.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Dec 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Colorado

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Pearl Moon Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 9073 Holman - 44200 Hillje

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Holman Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.