Longday BESS SLF (ERCOT-25INR0502) — Project Summary

Queue ID
ERCOT-25INR0502
Capacity
—
Technology
Battery
Status
active
Location
Kinney, TX
Region
ERCOT
Developer
Longday Solar
IA Status
—

Longday BESS SLF

ERCOT-25INR0502BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

— hybrid in Kinney, TX · In queue since July 2023 · Proposed COD December 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

—

Capacity

0

Components

3y 3m

In Queue

—

IA Status

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 5m

Pre-Study0%
Queue EntryJul 31, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-15

About

Longday BESS SLF (queue ID ERCOT-25INR0502) is a proposed battery energy storage development project in Kinney County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Longday Solar and is classified as a hybrid project. Its listed technology components are battery energy storage and a second component categorized as "Other." The data does not specify a total capacity or individual component capacities.

The project entered the ERCOT interconnection queue on July 31, 2023, and its queue status is active. It proposes to interconnect at a tap on the 138 kV line between the Brackettville (8252) and Escondido (8260) substations. The proposed commercial operation date is December 15, 2027. The available data does not report the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Kinney

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Longday Solar

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138 kV 8252 Brackettville - 8260 Escondido

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
ECLIPSE_UN1
POI Substation
Brackettville Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Longday BESS SLF
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.