Willow Beach Wind (ERCOT-25INR0494) — Project Summary

Queue ID
ERCOT-25INR0494
Capacity
202.33 MW
Technology
Wind
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Capital Wind, LLC
IA Status
IA Executed

Willow Beach Wind

ERCOT-25INR0494BetaActiveWindERCOTLBNL + Live

202.33 MW generation in Brazoria, TX · In queue since October 2023 · Proposed COD October 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

202.33 MW

Capacity

1

Components

Wind

3y 1m

In Queue

IA Executed

IA Phase

Signed Jun 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 8m

IA → COD

2y 4m

Total Duration

1y 8m

Construction75%
Queue EntryOct 13, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJun 16, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2027-10-01

Queue history
25INR0494 · 35 monthly ERCOT reports, Oct 2023 – Sep 2026

Projected COD moved

1 time

Jun 2025 → Oct 2027

Net change

+28 months

first report to latest

Capacity

204 → 202 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 13, 2023
Facilities study approvedNov 18, 2024
Interconnection agreement signedJun 16, 2025
On ERCOT's inactive listNov 2025 – Nov 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Sep 2027
Differs from queue: Oct 1, 2027From queue filing
Developer in saved assessment
AES Corporation
Filed as Capital Wind, LLC
Status at research time
IA Executed
IA Executed — interconnection agreement signed June 2025, project in pre-construction phase targeting Q3 2027 COD
Financing
Not recorded

Milestones in this assessment

IA executedJun 16, 2025

ERCOT Standard Generation Interconnection Agreement executed with CenterPoint Energy Houston Electric

interchange.puc.texas.gov
COD targetSep 2027Latest in this assessment

ERCOT capacity chart lists 202.33 MW Willow Beach Wind targeting 2027 online date

ercot.com
Research sources and reasoning (5 recorded sources)

high confidence at research time

  1. interchange.puc.texas.gov/search/filings/?ControlNumber=35077&ItemMatch=0&SortBy=FilingParty&SortOrder=Descending&Page=1
  2. sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit211.htm
  3. ercot.com/files/docs/2026/03/05/Capacity-Changes-by-Fuel-Type-Charts_February_2026.xlsx
  4. cleanview.co/planned-wind-projects/TX/25INR0494/willow-beach-wind
  5. ercotqueue.com/developer/capital-wind-llc

Commercial operation date: LBNL proposed COD of 2027-10-01 aligns with multiple independent sources (Cleanview, ERCOT capacity chart, renewablesinfo) all citing September/2027 target. No contradictory signals found.

Developer: LBNL filing entity is 'Capital Wind, LLC' (project SPV). SEC filing (AES 10-K Exhibit 21.1) lists 'Willow Beach Wind, LLC' as an AES subsidiary, indicating AES Corporation is the parent/operating company behind the Capital Wind shell.

Status: LBNL shows IA executed 2025-06-16, confirmed by Texas PUC filing (Control #35077) referencing 'Amendment One to ERCOT Standard Generation Interconnection Agreement' for Willow Beach Wind dated May 2025.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Willow Beach Wind project is a proposed 202.33 MW wind generation facility in Brazoria County, Texas. Developed by ACE DevCo NC LLC, the project consists of 202.33 MW of wind capacity. It is listed in the ERCOT interconnection queue as entry ERCOT-25INR0494, with a queue entry date of October 13, 2023, and a proposed commercial operation date of October 1, 2027. The project's interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing Willow Beach Wind operating plant (EIA ID 68090). Recent news coverage of the project includes regulatory matters.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Capital Wind, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138 kV Bus# 42100 HUD_8 – Bus# 42960 MUSTNG_S04_8 138kV CKT# 4

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW
POI Substation
Amoco Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.