Solheim Solar
108.68 MW generation in Bosque, TX · In queue since August 2023 · Proposed COD November 2027
108.68 MW
Capacity
1
Components
Solar
3y 3m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 3m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Completed, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-11-01
Projected COD moved
2 times
Nov 2027 → Nov 2027
Net change
0 months
first report to latest
Capacity
109 MW
unchanged in the reports
Latest stage
Facilities study done
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
- —·Emblaze Solar, LLC→Solheim Solar, LLCpacermonitor.com
Research sources and reasoning (3 recorded sources)
medium confidence at research time
- pinegaterenewables.com/solheim-solar/
- pinegaterenewables.com/wp-content/uploads/2024/11/Solheim-Fact-Sheet.pdf
- pacermonitor.com/public/filings/DR3RODUA/Pine_Gate_Renewables_LLC_and_Official__txsbke-25-90669__0231.1.pdf
Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-11-01. Pine Gate Renewables project page confirms the project exists and is in development but provides no specific COD. No contradictory dates found in research.
Developer: LBNL filing entity is 'Solheim Solar, LLC' (project-specific LLC). Pine Gate Renewables' official project page at pinegaterenewables.com/solheim-solar/ identifies them as the developer and owner-operator. PACER filing confirms 'Solheim Solar, LLC f/k/a Emblaze Solar, LLC' is a Pine Gate entity.
Status: LBNL shows 'active' status in Facility Study phase with no IA executed. Pine Gate's active project page and fact sheet confirm ongoing development. Local Facebook opposition group (April 2025) indicates project is still being pursued.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Solheim Solar project is a proposed 108.68 MW solar generation facility in Bosque County, Texas. Developed by Solheim Solar, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0474, with a queue entry date of August 14, 2023. The proposed commercial operation date is November 1, 2027.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the Meridian (Bus# 315) - Glen Rose (Bus #319) 69 kV line. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Bosque
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Solheim Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Meridian (Bus# 315) - Glen Rose (Bus #319) 69 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.