Solheim Solar (ERCOT-25INR0474) — Project Summary

Queue ID
ERCOT-25INR0474
Capacity
108.68 MW
Technology
Solar
Status
active
Location
Bosque, TX
Region
ERCOT
Developer
Solheim Solar, LLC
IA Status
Facility Study

Solheim Solar

ERCOT-25INR0474BetaActiveSolarERCOTLBNL + Live

108.68 MW generation in Bosque, TX · In queue since August 2023 · Proposed COD November 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

108.68 MW

Capacity

1

Components

Solar

3y 3m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 3m

Facilities Study50%
Queue EntryAug 14, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Completed, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-11-01

Queue history
25INR0474 · 30 monthly ERCOT reports, Apr 2024 – Sep 2026

Projected COD moved

2 times

Nov 2027 → Nov 2027

Net change

0 months

first report to latest

Capacity

109 MW

unchanged in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 14, 2023
Facilities study approvedMar 6, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Nov 2027
From queue filing
Developer in saved assessment
Pine Gate Renewables
Filed as Solheim Solar, LLC
Status at research time
Active
Active — in Facility Study phase, pre-construction development with community engagement ongoing
Financing
Not recorded
Ownership history
  1. —·Emblaze Solar, LLC→Solheim Solar, LLCpacermonitor.com
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. pinegaterenewables.com/solheim-solar/
  2. pinegaterenewables.com/wp-content/uploads/2024/11/Solheim-Fact-Sheet.pdf
  3. pacermonitor.com/public/filings/DR3RODUA/Pine_Gate_Renewables_LLC_and_Official__txsbke-25-90669__0231.1.pdf

Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-11-01. Pine Gate Renewables project page confirms the project exists and is in development but provides no specific COD. No contradictory dates found in research.

Developer: LBNL filing entity is 'Solheim Solar, LLC' (project-specific LLC). Pine Gate Renewables' official project page at pinegaterenewables.com/solheim-solar/ identifies them as the developer and owner-operator. PACER filing confirms 'Solheim Solar, LLC f/k/a Emblaze Solar, LLC' is a Pine Gate entity.

Status: LBNL shows 'active' status in Facility Study phase with no IA executed. Pine Gate's active project page and fact sheet confirm ongoing development. Local Facebook opposition group (April 2025) indicates project is still being pursued.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Solheim Solar project is a proposed 108.68 MW solar generation facility in Bosque County, Texas. Developed by Solheim Solar, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0474, with a queue entry date of August 14, 2023. The proposed commercial operation date is November 1, 2027.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the Meridian (Bus# 315) - Glen Rose (Bus #319) 69 kV line. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Bosque

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Solheim Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Meridian (Bus# 315) - Glen Rose (Bus #319) 69 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.