Yooperlite Storage (ERCOT-25INR0466) — Project Summary

Queue ID
ERCOT-25INR0466
Capacity
175.65 MW
Technology
Battery
Status
active
Location
Wise, TX
Region
ERCOT
Developer
BT Yooperlite Storage, LLC
IA Status
Facility Study

Yooperlite Storage

ERCOT-25INR0466BetaActiveBatteryERCOTLBNL + Live

175.65 MW storage in Wise, TX · In queue since June 2023 · Proposed COD May 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

175.65 MW

Capacity

1

Components

Battery

3y 5m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 11m

Facilities Study50%
Queue EntryJun 28, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Completed, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-31

Queue history
25INR0466 · 40 monthly ERCOT reports, Jun 2023 – Sep 2026

Projected COD moved

2 times

Dec 2025 → May 2028

Net change

+29 months

first report to latest

Capacity

176 MW

unchanged in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 28, 2023
Facilities study approvedMay 19, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Nov 2027
Differs from queue: May 31, 2028
Developer in saved assessment
Belltown Power Texas 2, LLC
Filed as BT Yooperlite Storage, LLC
Status at research time
Active
Active — Facility Study phase, no IA executed. Regulatory approvals pending per EIA 860M, not yet under construction.
Financing
Not recorded

Milestones in this assessment

COD targetNov 2027Latest in this assessment

Expected online November 2027 per Cleanview project tracker

cleanview.co
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/68178_YOOBA/yooperlite-storage
  2. cleanview.co/planned-battery-projects/TX/68178_YOOBA/yooperlite-storage
  3. eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05
  4. apiproxy.utc.wa.gov/cases/GetDocument?docID=738&year=2025&docketNumber=250224
  5. bizapedia.com/tx/bt-yooperlite-storage-llc.html

Commercial operation date: LBNL queue shows 2028-05-31, but Cleanview (Result 2 & 8) reports expected online November 2027, a ~6-month earlier target. This is a minor variance typical of queue lag.

Developer: LBNL filing entity is 'BT Yooperlite Storage, LLC' (project-specific LLC per Result 11). EIA 860M (Result 3) and WA.gov filing (Result 12) identify the operating company as 'Belltown Power Texas 2, LLC', the parent entity.

Status: LBNL status 'active' at Facility Study stage is confirmed by EIA 860M (Result 3) noting 'Regulatory approvals pending. Not under construction.' No signals of withdrawal or construction start.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Yooperlite Storage project is a proposed 175.65 MW battery storage project located in Wise County, Texas. Developed by BT Yooperlite Storage, LLC, the project consists entirely of battery storage. It is listed in the ERCOT interconnection queue as entry ERCOT-25INR0466, with a queue entry date of June 28, 2023, and a proposed commercial operation date of May 31, 2028. The project's interconnection status is currently in the Facility Study phase.

The Yooperlite Storage project is linked to an existing operating plant of the same name (EIA plant ID 68178). The project has also been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Wise

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BT Yooperlite Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138 kV 580 Westbrook Switch - 588 Willow

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
WCPP_CC1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.