Wizard Ranch Solar (ERCOT-25INR0449) — Project Summary

Queue ID
ERCOT-25INR0449
Capacity
100.53 MW
Technology
Solar
Status
suspended
Location
Jack, TX
Region
ERCOT
Developer
—
IA Status
—

Wizard Ranch Solar

ERCOT-25INR0449BetaSuspendedSolarERCOTLBNL

100.53 MW generation in Jack, TX · In queue since May 2023

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

100.53 MW

Capacity

1

Components

Solar

3y 6m

In Queue

—

IA Status

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 6m

Suspended0%
Queue EntryMay 2, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

Queue history
25INR0449 · 3 monthly ERCOT reports, Jan 2024 – Mar 2024

Projected COD moved

1 time

May 2026 → May 2027

Net change

+12 months

first report to latest

Capacity

101 MW

unchanged in the reports

Latest stage

Screening started

last listed Mar 2024

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 3, 2023
On ERCOT's inactive listApr 2024 – Dec 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Project lifecycle
as of 2022-08-06
OperationalNoTullahoma News · 2022-08-06
TechnologySolarTullahoma News · 2022-08-06
DeveloperSilicon Ranch CorporationTullahoma News · 2022-08-06
PPA offtakerTVATullahoma News · 2022-08-06

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The proposed Wizard Ranch Solar project is a 100.53 MW solar generation facility located in Jack County, Texas. The project is listed in the ERCOT interconnection queue as entry ERCOT-25INR0449. Its status is currently suspended.

The Wizard Ranch Solar project has been featured in recent industry news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Mar 2024.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Jack

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

—

Utility

—

Entity

ERCOT

Service Type

—

Data Source

LBNL

PartnerTennessee Valley AuthorityTullahoma News · 2022-08-06
CompanySilicon Ranch CorporationTullahoma News · 2022-08-06
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.