Guitar BESS
204.79 MW storage in Callahan, TX · In queue since May 2023 · Proposed COD December 2027
204.79 MW
Capacity
1
Components
Battery
3y 6m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 7m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-31
Projected COD moved
1 time
Feb 2026 → Dec 2027
Net change
+22 months
first report to latest
Capacity
205 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
No interconnection agreement executed; project in Facility Study phase
ercotqueue.comResearch sources and reasoning (5 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/25INR0446/guitar-bess
- ercotqueue.com/project/25INR0446
- interconnection.fyi/project/ercot-25inr0446
- bizapedia.com/tx/guitar-bess-llc.html
- cleanview.co/power-projects/developers/chermac-energy
Commercial operation date: Only LBNL queue data provides a COD target of December 2027. Cleanview aggregator mirrors this date but adds no independent verification. No press releases or developer announcements found.
Developer: Guitar BESS LLC is a project-specific shell entity (filed May 2023 per Bizapedia). No parent company or operating developer identified in any search results. Cleanview lists it under Chermac Energy's pipeline, but this appears to be an aggregator inference without source attribution.
Status: LBNL reports 'Facility Study' stage with no IA date. Multiple aggregators (Cleanview, interconnection.fyi, ercotqueue.com) confirm active queue status. ERCOTqueue.com notes 'No IA; build-chance 5%' suggesting early-stage development.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Guitar BESS is a proposed battery energy storage development project in Callahan County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by Guitar BESS LLC, the standalone storage project has a planned capacity of 204.79 megawatts (MW). It is designed to connect to the grid at a tap on the 138 kV transmission line between the 6275 ABEAST4A and 6670 PUTN4C substations.
The project is listed in the ERCOT interconnection queue under the identifier 25INR0446 and entered the queue on May 15, 2023. Its status is active, and it is currently in the Facility Study phase of the interconnection process. The developer has proposed a commercial operation date of December 31, 2027.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Callahan
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Guitar BESS LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 6275 ABEAST4A - 6670 PUTN4C
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Guitar BESS
Data-driven briefing on Guitar BESS — fleet, generation, financial, and news signals.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage pipeline in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.