Guitar BESS (ERCOT-25INR0446) — Project Summary

Queue ID
ERCOT-25INR0446
Capacity
204.79 MW
Technology
Battery
Status
active
Location
Callahan, TX
Region
ERCOT
Developer
Guitar BESS LLC
IA Status
Facility Study

Guitar BESS

ERCOT-25INR0446BetaActiveBatteryERCOTLBNL + Live

204.79 MW storage in Callahan, TX · In queue since May 2023 · Proposed COD December 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

204.79 MW

Capacity

1

Components

Battery

3y 6m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 7m

Facilities Study50%
Queue EntryMay 15, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

Queue history
25INR0446 · 18 monthly ERCOT reports, Apr 2025 – Sep 2026

Projected COD moved

1 time

Feb 2026 → Dec 2027

Net change

+22 months

first report to latest

Capacity

205 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 15, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 31, 2027
From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
Active
Active — Facility Study stage, no interconnection agreement executed yet
Financing
Not recorded

Milestones in this assessment

IA executedLatest in this assessment

No interconnection agreement executed; project in Facility Study phase

ercotqueue.com
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/25INR0446/guitar-bess
  2. ercotqueue.com/project/25INR0446
  3. interconnection.fyi/project/ercot-25inr0446
  4. bizapedia.com/tx/guitar-bess-llc.html
  5. cleanview.co/power-projects/developers/chermac-energy

Commercial operation date: Only LBNL queue data provides a COD target of December 2027. Cleanview aggregator mirrors this date but adds no independent verification. No press releases or developer announcements found.

Developer: Guitar BESS LLC is a project-specific shell entity (filed May 2023 per Bizapedia). No parent company or operating developer identified in any search results. Cleanview lists it under Chermac Energy's pipeline, but this appears to be an aggregator inference without source attribution.

Status: LBNL reports 'Facility Study' stage with no IA date. Multiple aggregators (Cleanview, interconnection.fyi, ercotqueue.com) confirm active queue status. ERCOTqueue.com notes 'No IA; build-chance 5%' suggesting early-stage development.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Guitar BESS is a proposed battery energy storage development project in Callahan County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by Guitar BESS LLC, the standalone storage project has a planned capacity of 204.79 megawatts (MW). It is designed to connect to the grid at a tap on the 138 kV transmission line between the 6275 ABEAST4A and 6670 PUTN4C substations.

The project is listed in the ERCOT interconnection queue under the identifier 25INR0446 and entered the queue on May 15, 2023. Its status is active, and it is currently in the Facility Study phase of the interconnection process. The developer has proposed a commercial operation date of December 31, 2027.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Callahan

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Guitar BESS LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV 6275 ABEAST4A - 6670 PUTN4C

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.