Bluegill BESS
251 MW storage in Harris, TX · In queue since June 2023 · Proposed COD October 2028
251 MW
Capacity
1
Components
Battery
3y 5m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 4m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-10-31
Projected COD moved
3 times
Jul 2025 → Oct 2028
Net change
+39 months
first report to latest
Capacity
502 → 251 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Queue entry date — Facility Study stage, no IA executed yet
interconnection.fyiResearch sources and reasoning (5 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/25INR0434/bluegill-bess
- interconnection.fyi/project/ercot-25inr0434
- ercotqueue.com/project/25INR0434
- houstontx.gov/planning/Commissions/docs_pdfs/2026/Agenda%20Outline_05.14.26_REV.pdf
- scribd.com/document/807137741/Book4
Commercial operation date: LBNL queue filing shows October 2027 COD. Multiple aggregator sites (Cleanview, interconnection.fyi) echo this date, but no independent developer press releases or financing announcements exist to validate or update it.
Developer: LBNL filing entity is 'Bluegill BESS, LLC' — a project-specific LLC. No press releases, corporate announcements, or ownership disclosures found. One Scribd document mentions 'Silverpeak-Bluegill BESS' suggesting possible Silverpeak involvement, but this is unconfirmed and may refer to a different project or consultant relationship.
Status: LBNL status is 'active' at Facility Study stage. No public signals of withdrawal, construction start, or financing. Houston Planning Commission reference indicates potential local permitting engagement.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Bluegill BESS is a proposed 251 MW battery storage project located in Harris County, Texas. Developed by Bluegill BESS, LLC, the project consists entirely of battery storage. It is currently in the ERCOT interconnection queue as entry ERCOT-25INR0434, with a queue entry date of June 28, 2023.
The proposed commercial operation date (COD) for Bluegill BESS is October 31, 2027. The project's interconnection status is currently in the Facility Study phase. The point of interconnection (POI) is Tap 138 kV 40130 Atascocita - 40690 East Gate. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Harris
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Bluegill BESS, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138 kV 40130 Atascocita - 40690 East Gate
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- MEDIUM
- POI Substation
- Atascocita Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery storage pipeline in ERCOT
Data tables and metrics from the InfraSure database.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.