Fike BESS (ERCOT-25INR0380) — Project Summary

Queue ID
ERCOT-25INR0380
Capacity
200.8 MW
Technology
Battery
Status
active
Location
Hidalgo, TX
Region
ERCOT
Developer
BRP Blue Topaz 9, LLC
IA Status
Facility Study

Fike BESS

ERCOT-25INR0380BetaActiveBatteryERCOTLBNL

200.8 MW storage in Hidalgo, TX · In queue since May 2023 · Proposed COD June 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

200.8 MW

Capacity

1

Components

Battery

3y 6m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 1m

Facilities Study50%
Queue EntryMay 15, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-06-18

Queue history
25INR0380 · 35 monthly ERCOT reports, May 2023 – Mar 2026

Projected COD moved

2 times

Sep 2025 → Jun 2027

Net change

+21 months

first report to latest

Capacity

201 → 201 MW

changed in the reports

Latest stage

Cancelled

last listed Mar 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 15, 2023
CancelledApr 23, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
May 14, 2028
Differs from queue: Jun 18, 2027
Developer in saved assessment
BRP Blue Topaz 9, LLC
From queue filing
Status at research time
Withdrawn
Withdrawn — interconnection.fyi lists project status as 'Withdrawn' as of their most recent update
Financing
Not recorded

Milestones in this assessment

Withdrawn

Project status changed to Withdrawn in ERCOT queue

interconnection.fyi
COD targetMay 14, 2028Latest in this assessment

Proposed completion date revised from August 31, 2025 to May 14, 2028

interconnectionfyi.substack.com
Research sources and reasoning (2 recorded sources)

high confidence at research time

  1. interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-602
  2. interconnection.fyi/projects/state/TX

Commercial operation date: Interconnection.fyi (March 2025) reports proposed completion changed from August 2025 to May 14, 2028, reflecting a ~1-year slip from LBNL's June 2027 target. This is typical for BESS projects in ERCOT facility study phase.

Developer: No press releases or corporate announcements found identifying a parent company. BRP Blue Topaz 9, LLC appears to be the actual developer rather than a shell entity, as no alternative operating company was mentioned in any sources.

Status: Interconnection.fyi database explicitly lists Fike BESS status as 'Withdrawn' in their Texas projects listing, contradicting LBNL's 'active' status which reflects an earlier snapshot.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Fike BESS project is a proposed 200.8 MW battery storage project located in Hidalgo County, Texas. Developed by BRP Blue Topaz 9, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0380, with a queue entry date of May 15, 2023.

The proposed commercial operation date for the Fike BESS project is June 18, 2027. The project's interconnection status is currently in the Facility Study phase. Recent news coverage has discussed the development.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Mar 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Hidalgo

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BRP Blue Topaz 9, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

5754 Aderhold 138kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Aderhold Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.