Fike BESS
200.8 MW storage in Hidalgo, TX · In queue since May 2023 · Proposed COD June 2027
200.8 MW
Capacity
1
Components
Battery
3y 6m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-06-18
Projected COD moved
2 times
Sep 2025 → Jun 2027
Net change
+21 months
first report to latest
Capacity
201 → 201 MW
changed in the reports
Latest stage
Cancelled
last listed Mar 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Proposed completion date revised from August 31, 2025 to May 14, 2028
interconnectionfyi.substack.comResearch sources and reasoning (2 recorded sources)
high confidence at research time
- interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-602
- interconnection.fyi/projects/state/TX
Commercial operation date: Interconnection.fyi (March 2025) reports proposed completion changed from August 2025 to May 14, 2028, reflecting a ~1-year slip from LBNL's June 2027 target. This is typical for BESS projects in ERCOT facility study phase.
Developer: No press releases or corporate announcements found identifying a parent company. BRP Blue Topaz 9, LLC appears to be the actual developer rather than a shell entity, as no alternative operating company was mentioned in any sources.
Status: Interconnection.fyi database explicitly lists Fike BESS status as 'Withdrawn' in their Texas projects listing, contradicting LBNL's 'active' status which reflects an earlier snapshot.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Fike BESS project is a proposed 200.8 MW battery storage project located in Hidalgo County, Texas. Developed by BRP Blue Topaz 9, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0380, with a queue entry date of May 15, 2023.
The proposed commercial operation date for the Fike BESS project is June 18, 2027. The project's interconnection status is currently in the Facility Study phase. Recent news coverage has discussed the development.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Mar 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Hidalgo
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BRP Blue Topaz 9, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
5754 Aderhold 138kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Aderhold Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.