NavBoot BESS
303.7 MW storage in Nueces, TX · In queue since March 2023 · Proposed COD November 2027
303.7 MW
Capacity
1
Components
Battery
3y 8m
In Queue
IA Executed
IA Phase
Signed Oct 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 7m
IA → COD
2y 1m
Total Duration
2y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 6–18 months
Proposed COD: 2027-11-11
Projected COD moved
2 times
Jun 2025 → Nov 2027
Net change
+29 months
first report to latest
Capacity
304 MW
unchanged in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
ERCOT standard generation interconnection agreement between AEP Texas and Navboot BESS LLC. The IA date is from LBNL, and the PUC docket shows the agreement filed 2025-10-24.
interchange.puc.texas.govResearch sources and reasoning (5 recorded sources)
medium confidence at research time
- interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=35077&DocumentType=ALL&SortBy=FilingParty&SortOrder=Ascending
- interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
- sec.gov/Archives/edgar/data/1519472/000164033426000651/solarmax_10k.htm
- interconnection.fyi/project/ercot-25inr0375
- ercotqueue.com/project/25INR0375
Commercial operation date: No post-LBNL source gives a COD. The interconnection.fyi mirror of the queue data shows 'proposed completion date is November 11, 2027', which is the same as LBNL. The IA was executed in late 2025, so the date is not clearly stale.
Developer: Every source names Navboot BESS LLC (LBNL, PUC filings, the SolarMax 10-K EPC agreement, ercotqueue.com). No parent or sponsor is identified. SolarMax appears only as the EPC counterparty, not as the developer.
Status: LBNL shows IA Executed (2025-10-20) and active. PUC Interchange filings of an SGIA between AEP Texas and Navboot BESS LLC, plus the EPC agreement in the SolarMax 10-K, are consistent with a project moving toward construction.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The NavBoot BESS project is a proposed 303.7 MW battery storage project located in Nueces County, Texas. Developed by Navboot BESS LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0375, with a queue entry date of March 13, 2023.
The project's proposed commercial operation date is November 11, 2027. Its interconnection status is currently in the Facility Study phase. The point of interconnection is the 8858 MCKENZIE4A 138kV substation.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Nueces
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Navboot BESS LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
8858 MCKENZIE4A 138kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.