Star Dairy Storage (ERCOT-25INR0334) — Project Summary

Queue ID
ERCOT-25INR0334
Capacity
204.93 MW
Technology
Solar+Battery
Status
active
Location
Lamar, TX
Region
ERCOT
Developer
Star Dairy Storage
IA Status
IA Executed

Star Dairy Storage

ERCOT-25INR0334BetaActiveBatteryBatteryERCOTLBNL + Live

204.93 MW generation in Lamar, TX · In queue since April 2023 · Proposed COD July 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

204.93 MW

Capacity

1

Components

Battery

3y 7m

In Queue

IA Executed

IA Phase

Signed Dec 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 8m

IA → COD

2y 7m

Total Duration

1y 8m

Construction75%
Queue EntryApr 19, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 9, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-07-12

Queue history
25INR0334 · 37 monthly ERCOT reports, Apr 2023 – Sep 2026

Projected COD moved

4 times

Mar 2026 → Jul 2027

Net change

+16 months

first report to latest

Capacity

209 → 205 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 19, 2023
Facilities study approvedSep 16, 2026
Interconnection agreement signedDec 9, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Apr 2027
Differs from queue: Jul 12, 2027From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
Active
Active — IA executed Dec 2024, on track for Apr 2027 COD per ERCOT planning documents
Financing
Not recorded

Milestones in this assessment

IA executedDec 9, 2024

Interconnection Agreement executed with ERCOT

ercot.com
COD targetApr 2027Latest in this assessment

Target commercial operation date per PUC Texas generation table

ftp.puc.texas.gov
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. ercot.com/files/docs/2025/12/04/Capacity-Changes-by-Fuel-Type-Charts_November_2025_PlannedMonthly.xlsx
  2. ftp.puc.texas.gov/public/puct-info/industry/electric/reports/genplant/gentable.xls
  3. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
  4. cleanview.co/power-projects/planned/battery-storage-projects/texas/25INR0334/star-dairy-storage

Commercial operation date: LBNL queue shows April 2027 COD with IA executed Dec 2024. Multiple ERCOT planning documents (Nov 2025 capacity chart, PUC Texas gen table) confirm 2027 target. No contradicting news sources found.

Developer: LBNL filing entity is 'Star Dairy Storage' which appears to be a project-specific LLC. No press releases, corporate announcements, or news coverage identify the parent developer or operating company behind this project.

Status: LBNL shows 'active' status with IA executed Dec 9, 2024. ERCOT capacity planning documents from Nov 2025 continue to list project with 2027 target, indicating no withdrawal or suspension.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Star Dairy Storage (ERCOT queue ID 25INR0334) is a proposed energy development project in Lamar County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by an entity also named Star Dairy Storage, the project has a total capacity of 204.93 MW. Although the queue classifies its technology as Solar+Battery, the only component listed is battery energy storage, accounting for the full 204.93 MW. The project is categorized as a generation project and plans to interconnect at a tap on the 345 kV line between the PARIS_SW1_5 (1692) and WOODARD_5 (11699) substations.

The project entered the ERCOT interconnection queue on April 19, 2023, and holds an active status. It executed an interconnection agreement on December 9, 2024, a significant milestone in the ERCOT interconnection process. The proposed commercial operation date is July 12, 2027.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Lamar

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Star Dairy Storage

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 1692 PARIS_SW1_5 -- 11699 WOODARD_5

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.