Hornet Storage II SLF (ERCOT-25INR0283) — Project Summary

Queue ID
ERCOT-25INR0283
Capacity
—
Technology
Battery
Status
active
Location
Swisher, TX
Region
ERCOT
Developer
Hornet Storage II LLC
IA Status
—

Hornet Storage II SLF

ERCOT-25INR0283BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

— hybrid in Swisher, TX · In queue since January 2023 · Proposed COD July 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

—

Capacity

0

Components

3y 9m

In Queue

—

IA Status

Signed Aug 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 7m

IA → COD

3y 11m

Total Duration

1y 7m

Construction0%
Queue EntryJan 3, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementAug 21, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-07-31

About

Hornet Storage II SLF (ERCOT queue ID 25INR0283) is a proposed battery energy storage development project in Swisher County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Hornet Storage II LLC and is classified as a hybrid project. Its listed technology components include battery energy storage and a component categorized as "Other." The provided data does not specify the project's total capacity in megawatts or the capacities of its individual components.

The project entered the ERCOT interconnection queue on January 3, 2023, and its queue status is active. An interconnection agreement was executed on August 21, 2024. The project's proposed point of interconnection is the Ozark Trail Switch 345 kV substation (Bus #23901). Its proposed commercial operation date is July 31, 2028.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Swisher

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hornet Storage II LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Ozark Trail Switch 345kV substation (Bus # 23901)

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Ozark Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Hornet Storage II SLF
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.