Cosper Solar (ERCOT-25INR0281) — Project Summary

Queue ID
ERCOT-25INR0281
Capacity
148.16 MW
Technology
Solar
Status
active
Location
Bell, TX
Region
ERCOT
Developer
Gransolar Texas Twenty LLC
IA Status
IA Executed

Cosper Solar

ERCOT-25INR0281BetaActiveSolarERCOTLBNL + Live

148.16 MW generation in Bell, TX · In queue since January 2023 · Proposed COD November 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

148.16 MW

Capacity

1

Components

Solar

3y 10m

In Queue

IA Executed

IA Phase

Signed Jul 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 6m

IA → COD

2y 4m

Total Duration

2y 6m

Construction75%
Queue EntryJan 3, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJul 31, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-11-12

Queue history
25INR0281 · 40 monthly ERCOT reports, Jun 2023 – Sep 2026

Projected COD moved

3 times

Dec 2025 → Nov 2027

Net change

+23 months

first report to latest

Capacity

148 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 3, 2023
Facilities study approvedNov 1, 2024
Interconnection agreement signedJul 31, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Nov 2027
From queue filing
Developer in saved assessment
Gransolar Group
Filed as Gransolar Texas Twenty LLC
Status at research time
Active
Active — IA executed July 2025, pre-construction phase with 2027 target
Financing
Not recorded

Milestones in this assessment

IA executedJul 31, 2025

ERCOT Standard Generation Interconnection Agreement executed and filed with Texas PUC

interchange.puc.texas.gov
COD targetNov 12, 2027Latest in this assessment

Proposed commercial operation date per ERCOT queue filing

cleanview.co
Research sources and reasoning (8 recorded sources)

medium confidence at research time

  1. interconnection.fyi/project/ercot-25inr0281
  2. cleanview.co/power-projects/planned/solar-farms/texas/67773_GRS20/cosper-solar
  3. gem.wiki/Cosper_solar_farm
  4. ercotqueue.com/project/25INR0281
  5. interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-442
  6. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&ItemMatch=Equal&DocumentType=ALL&SortBy=ItemType&SortOrder=Ascending&Page=2
  7. eia.gov/electricity/monthly/xls/table_6_05.xlsx
  8. renewablesinfo.org/browse/owner/gransolar-group-grs

Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-11-12. No independent news sources or press releases found to confirm or contradict this date. Multiple aggregator sites (Cleanview, GEM.wiki) echo the November 2027 target, but these appear derivative of LBNL data rather than independent confirmation.

Developer: LBNL filing entity is 'Gransolar Texas Twenty LLC', a project-specific shell LLC. Multiple sources (renewablesinfo.org, ercotqueue.com) identify the parent as 'Gransolar Group' (GRS), a Spanish renewable energy developer with multiple Texas projects under numbered LLCs (Texas Ten, Texas Fifteen, Texas Sixteen, Texas Twenty).

Status: LBNL shows 'active' status with IA executed on 2025-07-31. EIA database (Table 6_05) confirms 'Regulatory approvals pending. Not under construction' as of their latest update. No construction start announcements found in search results.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Cosper Solar project is a proposed 148.16 MW solar generation facility in Bell County, Texas. Developed by Gransolar Texas Twenty LLC, the project is interconnected within the ERCOT region and entered the interconnection queue as ERCOT-25INR0281 on January 3, 2023. The proposed commercial operation date is November 12, 2027, and the project's interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing Cosper Solar operating plant (EIA ID 67773).

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Bell

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Gransolar Texas Twenty LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV 115 Ding Dong - 3630 Copperas Cove Tu

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Ding Dong Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.