OCI Cobb Creek ESS
201.6 MW generation in Hill, TX · In queue since December 2022 · Proposed COD December 2028
201.6 MW
Capacity
1
Components
Battery
3y 11m
In Queue
IA Executed
IA Phase
Signed Jul 2024
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
1y 7m
IA → COD
4y 5m
Total Duration
1y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 18–30 months
Proposed COD: 2028-12-31
Projected COD moved
6 times
Jun 2025 → Dec 2028
Net change
+42 months
first report to latest
Capacity
202 MW
unchanged in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Standard Generation Interconnection Agreement executed with Oncor Electric Delivery
interchange.puc.texas.govERCOT official capacity tracking lists 2027 COD for 201.6 MW battery project
ercot.comResearch sources and reasoning (5 recorded sources)
high confidence at research time
- ercot.com/files/docs/2026/01/08/Capacity-Changes-by-Fuel-Type-Charts_December_2025.xlsx
- ercot.com/files/docs/2025/12/04/Capacity-Changes-by-Fuel-Type-Charts_November_2025_PlannedMonthly.xlsx
- interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
- modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
- ftp.puc.texas.gov/public/puct-info/industry/electric/reports/genplant/gentable.xls
Commercial operation date: ERCOT official capacity charts from Dec 2025 and Jan 2026 list COD as 2027, vs LBNL's 2028-12-31. ERCOT's internal tracking is more current than queue snapshot.
Developer: LBNL filing uses project LLC 'Hillsboro Solar Project LLC'. PUC filings and ERCOT buildout reports consistently reference 'OCI Hillsboro Solar LLC' and project name prefix 'OCI Cobb Creek', indicating OCI is the parent/operating company.
Status: LBNL status 'active' with IA executed 2024-07-24 is confirmed. ERCOT buildout reports show 'SS Completed, FIS Started' as of May 2024, and project remains in active pipeline through Jan 2026 ERCOT charts.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The OCI Cobb Creek ESS project is a proposed 201.6 MW battery storage project located in Hill County, Texas. The developer is Hillsboro Solar Energy Holdings LLC. It is interconnected within the ERCOT region under queue ID ERCOT-25INR0233, with a queue entry date of December 7, 2022, and a proposed commercial operation date of December 31, 2027.
The project's interconnection agreement (IA) has been executed as of July 24, 2024. The point of interconnection (POI) is at tap 345kV 1907 Venus - 68090 Sam Sw. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Hill
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Hillsboro Solar Project LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 345kV 1907 Venus - 68090 Sam Sw
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- DSWL_BES1
- POI Substation
- Venus Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09
View all articlesHillsboro Solar Project
Data-driven briefing on Hillsboro Solar Project — fleet, generation, financial, and news signals.
Hillsboro
Data-driven briefing on Hillsboro — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.