OCI Cobb Creek Solar (ERCOT-25INR0229) — Project Summary

Queue ID
ERCOT-25INR0229
Capacity
203.1 MW
Technology
Solar+Battery
Status
active
Location
Hill, TX
Region
ERCOT
Developer
Hillsboro Solar Project LLC
IA Status
IA Executed

OCI Cobb Creek Solar

ERCOT-25INR0229BetaActiveSolarBatteryERCOTLBNL + Live

203.1 MW hybrid in Hill, TX · In queue since November 2022 · Proposed COD December 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

203.1 MW

Capacity

1

Components

Solar

4 years

In Queue

IA Executed

IA Phase

Signed Jul 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 8m

IA → COD

3y 5m

Total Duration

1y 8m

Construction75%
Queue EntryNov 15, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJul 24, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-12-31

Queue history
25INR0229 · 47 monthly ERCOT reports, Nov 2022 – Sep 2026

Projected COD moved

5 times

Jun 2025 → Dec 2027

Net change

+30 months

first report to latest

Capacity

204 → 203 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 15, 2022
Facilities study approvedMay 6, 2024
Interconnection agreement signedJul 24, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2026
Differs from queue: Dec 31, 2027
Developer in saved assessment
OCI
Filed as Hillsboro Solar Project LLC
Status at research time
IA Executed
IA Executed — interconnection agreement signed July 2024, project active with 2026 target COD per ERCOT planning documents
Financing
Not recorded

Milestones in this assessment

IA executedJul 24, 2024

Standard Generation Interconnection Agreement executed between Oncor and OCI Hillsboro Solar LLC

interchange.puc.texas.gov
COD target2026Latest in this assessment

ERCOT capacity planning documents list 2026 as expected online date for 203.1 MW solar facility

ercot.com
Research sources and reasoning (3 recorded sources)

high confidence at research time

  1. ercot.com/files/docs/2025/12/04/Capacity-Changes-by-Fuel-Type-Charts_November_2025_PlannedMonthly.xlsx
  2. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=FilingParty&SortOrder=Descending
  3. eta-publications.lbl.gov/sites/default/files/2024-09/hybrid_plant_tracking_2024_data_workbook.xlsx

Commercial operation date: ERCOT's December 2025 capacity planning chart lists OCI Cobb Creek Solar with a 2026 COD, which is 1 year earlier than LBNL's 2027-12-31 proposed date. Given the IA was executed in July 2024 and ERCOT's planning documents reflect current developer commitments, the 2026 target is more current.

Developer: LBNL filing entity is 'Hillsboro Solar Project LLC' (project-specific shell). Multiple sources including PUC filings and LBL data reference 'OCI Hillsboro Solar LLC' and the project name itself is 'OCI Cobb Creek Solar', indicating OCI is the parent/operating company.

Status: LBNL status 'active' with IA executed 2024-07-24 is confirmed by PUC filings showing Standard Generation Interconnection Agreement between Oncor and OCI Hillsboro Solar LLC. ERCOT capacity charts show project in 2026 pipeline.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The OCI Cobb Creek Solar project is a proposed 203.1 MW solar generation project located in Hill County, Texas. The developer is Hillsboro Solar Energy Holdings LLC. This project is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0229, with a queue entry date of November 15, 2022.

The proposed commercial operation date is December 31, 2027. The project has an executed Interconnection Agreement (IA) as of July 24, 2024. The point of interconnection (POI) is the tap 345kV 1907 Venus - 68090 Sam Sw. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Hill

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hillsboro Solar Project LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 345kV 1907 Venus - 68090 Sam Sw

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
DSWL_BES1
POI Substation
Venus Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.