East West BESS
122.6 MW storage in Kerr, TX · In queue since October 2022 · Proposed COD March 2028
122.6 MW
Capacity
1
Components
Battery
4y 1m
In Queue
IA Executed
IA Phase
Signed Jul 2024
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
1y 9m
IA → COD
3y 8m
Total Duration
1y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 6–18 months
Proposed COD: 2028-03-17
Projected COD moved
7 times
Feb 2025 → Mar 2028
Net change
+37 months
first report to latest
Capacity
101 → 123 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Target commercial operation date per ERCOT capacity planning charts
ercot.comResearch sources and reasoning (5 recorded sources)
medium confidence at research time
- lampasasdispatchrecord.com/news/lometa-couple-sound-alarm-over-battery-storage-plant
- ercot.com/files/docs/2026/02/05/Capacity-Changes-by-Fuel-Type-Charts_January_2026.xlsx
- ercot.com/files/docs/2026/01/08/Capacity-Changes-by-Fuel-Type-Charts_December_2025.xlsx
- ercot.com/files/docs/2025/11/06/Capacity-Changes-by-Fuel-Type-Charts_October_2025_PlannedMonthly.xlsx
- ercotqueue.com/project/25INR0202
Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-03-18. Multiple ERCOT capacity charts from late 2025 and early 2026 consistently list 2027 as the target year. No contradictory dates found in research.
Developer: Only source for developer identity is LBNL filing entity 'East West Energy Storage, LLC'. No press releases, corporate announcements, or news coverage identifying a parent company or operating entity. Entity appears to be project-specific LLC with no public parent disclosed.
Status: LBNL shows 'active' status with IA executed 2024-07-12. ERCOT capacity charts through February 2026 continue listing project for 2027. Ercotqueue.com shows 'FIS pending' status, indicating pre-construction phase.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The East West BESS project is a proposed 120.96 MW battery storage project located in Kerr County, Texas. Developed by East West Energy Storage, LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0202, with a queue entry date of October 6, 2022, and a proposed commercial operation date of March 18, 2027. The project's interconnection point is the 7750 LCRA MOUNTAIN HOME SUB. Its interconnection agreement status is currently in the Facility Study phase.
The proposed project has appeared in recent news coverage regarding energy storage developments in Texas.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Kerr
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
East West Energy Storage, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
7750 LCRA MOUNTAIN HOME SUB
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.