Photo Solar 2
300 MW hybrid in Uvalde, TX · In queue since September 2022 · Proposed COD May 2027
Withdrawn from the ERCOT queue in September 2026, according to ERCOT's queue (Oct 2026).
300 MW
Capacity
1
Components
Solar
4y 2m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Proposed COD: 2027-05-31
Project withdrew from interconnection queue
Projected COD moved
1 time
May 2027 → May 2028
Net change
+12 months
first report to latest
Capacity
300 MW
unchanged in the reports
Latest stage
Cancelled
last listed Aug 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- eta-publications.lbl.gov/sites/default/files/2024-09/hybrid_plant_tracking_2024_data_workbook.xlsx
- interconnection.fyi/projects/state/TX
- renewablesinfo.org/browse/projects/texas
- interconnection.fyi/projects/state/TX/uvalde-county
Commercial operation date: Only LBNL queue data provides a COD target of May 2027. No news articles or press releases mention this specific project's timeline or commercial operation date.
Developer: LBNL lists 'CED Development Inc.' as developer. No news coverage found to confirm whether this is an operating company or project LLC, and no alternative parent company identified.
Status: LBNL queue status is 'active' with IA status at 'Facility Study' stage. No news coverage contradicts this or provides updates on project advancement.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Photo Solar 2 is a proposed 300 MW solar generation project located in Uvalde County, Texas. The developer is CED Development Inc. The project is in the ERCOT interconnection queue as entry ERCOT-25INR0195, with a queue entry date of September 15, 2022, and a proposed commercial operation date of May 31, 2027. Its interconnection status is currently in the Facility Study phase.
The proposed project consists of 300 MW of solar photovoltaic generation. Photo Solar 2 has been the subject of recent news coverage, with 21 articles categorized as industry, regulatory, and grid-related.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Aug 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Uvalde
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
CED Development Inc.
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
5885 Downie 138kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- HELIOS_RN
- POI Substation
- Downie Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Photo Solar 2
Data-driven briefing on Photo Solar 2 — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.