Fortissimo BESS (ERCOT-25INR0190) — Project Summary

Queue ID
ERCOT-25INR0190
Capacity
202.65 MW
Technology
Battery
Status
active
Location
Montague, TX
Region
ERCOT
Developer
Fortissimo BESS, LCC
IA Status
Facility Study

Fortissimo BESS

ERCOT-25INR0190BetaActiveBatteryERCOTLBNL + Live

202.65 MW storage in Montague, TX · In queue since October 2022 · Proposed COD April 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

202.65 MW

Capacity

1

Components

Battery

4y 1m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 6m

Facilities Study50%
Queue EntryOct 18, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Completed, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-24

Queue history
25INR0190 · 44 monthly ERCOT reports, Feb 2023 – Sep 2026

Projected COD moved

1 time

Jul 2025 → Apr 2028

Net change

+33 months

first report to latest

Capacity

203 MW

unchanged in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 18, 2022
Facilities study approvedSep 12, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Apr 2028
From queue filing
Developer in saved assessment
Samsung Renewable Energy
Filed as Fortissimo BESS, LCC
Status at research time
Active
Active — in Facility Study phase, no IA executed yet. Third-party trackers assess 5% build probability given early interconnection stage.
Financing
Not recorded

Milestones in this assessment

COD targetApr 2028Latest in this assessment

Proposed commercial operation date April 2028 per ERCOT queue filing

cleanview.co
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/25INR0190/fortissimo-bess
  2. cleanview.co/power-projects/developers/samsung-renewable-energy
  3. ercotqueue.com/project/25INR0190
  4. newtools.cira.state.tx.us/upload/page/4769/docs/AgendaDocuments/2024/02-12-2024%20Agenda%20Documents.pdf

Commercial operation date: LBNL queue filing shows April 2028 COD. Cleanview aggregator confirms 'expected to come online in April 2028' but no independent developer announcements found to validate or update this target.

Developer: LBNL filing uses project-LLC 'Fortissimo BESS, LCC'. Cleanview lists this project under Samsung Renewable Energy's development pipeline as one of their 'Top 10 projects', indicating Samsung is the operating parent company behind the shell entity.

Status: LBNL shows 'Active' status in Facility Study. Ercotqueue.com confirms 'No IA' and assigns low 5% build-chance, typical for early-stage queue projects without financing or offtake announcements.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Fortissimo BESS project is a proposed 202.65 MW battery storage project located in Montague County, Texas. Developed by Fortissimo BESS, LCC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0190, with a queue entry date of October 18, 2022, and a proposed commercial operation date of April 24, 2028. The project's interconnection status is currently in the Facility Study phase, and its point of interconnection is the 741 Dyemound 138kV.

The proposed project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Montague

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Fortissimo BESS, LCC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

741 Dyemound 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.