Masava Storage (ERCOT-25INR0176) — Project Summary

Queue ID
ERCOT-25INR0176
Capacity
257.04 MW
Technology
Battery
Status
active
Location
Madison, TX
Region
ERCOT
Developer
Savannah Oaks Solar Project, LLC
IA Status
Facility Study

Masava Storage

ERCOT-25INR0176BetaActiveBatteryERCOTLBNL + Live

257.04 MW storage in Madison, TX · In queue since September 2022 · Proposed COD September 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

257.04 MW

Capacity

1

Components

Battery

4y 2m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6 years

Facilities Study50%
Queue EntrySep 2, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-30

Queue history
25INR0176 · 50 monthly ERCOT reports, Aug 2022 – Sep 2026

Projected COD moved

2 times

Sep 2025 → Sep 2028

Net change

+36 months

first report to latest

Capacity

251 → 257 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 2, 2022
Interconnection agreement signedOct 29, 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Sep 30, 2028
From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
Active
Active — Facility Study stage in ERCOT queue, no IA executed yet. No public announcements of construction timeline or financing.
Financing
Not recorded

Milestones in this assessment

IA executedLatest in this assessment

Facility Study stage — no IA executed as of current queue status

cleanview.co
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/25INR0176/masava-storage
  2. ercot.com/files/docs/2025/11/06/Capacity-Changes-by-Fuel-Type-Charts_October_2025.xlsx
  3. ercotqueue.com/developer/savannah-oaks-solar-project-llc
  4. ercotqueue.com/project/25INR0176

Commercial operation date: LBNL queue snapshot shows proposed COD of 2028-09-30. No independent news sources or press releases found to confirm or contradict this date. Cleanview aggregator sites mirror LBNL data without independent verification.

Developer: LBNL filing entity is 'Savannah Oaks Solar Project, LLC' which appears to be a project-specific shell LLC (also developing co-located 'Savannah Oaks Solar' 201MW project per ercotqueue.com). No press releases or corporate announcements found identifying the parent operating company or actual developer behind this entity.

Status: LBNL shows 'active' status at Facility Study stage with no IA date. No news coverage found indicating project advancement, withdrawal, or construction activity. Multiple aggregator sites confirm active queue status but provide no additional development updates.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The proposed Masava Storage project is a 261.51 MW battery energy storage system located in Madison County, Texas. The project is being developed by Savannah Oaks Solar Project, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0176, with a queue entry date of September 2, 2022.

The project's proposed commercial operation date is September 30, 2028. Its interconnection agreement status is currently in the Facility Study phase. The point of interconnection is at the tap 345 kV 46020 Limestone Plant - 967 Gibbons Creek ckt 18.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Madison

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Savannah Oaks Solar Project, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 345 kV 46020 Limestone Plant - 967 Gibbons Creek ckt 18

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.