Concho Pearl Solar (ERCOT-25INR0174) — Project Summary

Queue ID
ERCOT-25INR0174
Capacity
171.9 MW
Technology
Solar+Battery
Status
active
Location
Concho, TX
Region
ERCOT
Developer
Concho Pearl Solar, LLC
IA Status
IA Executed

Concho Pearl Solar

ERCOT-25INR0174BetaActiveSolarBatteryERCOTLBNL + Live

171.9 MW hybrid in Concho, TX · In queue since December 2022 · Proposed COD January 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

171.9 MW

Capacity

1

Components

Solar

3y 11m

In Queue

IA Executed

IA Phase

Signed Jul 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 7m

IA → COD

3y 6m

Total Duration

1y 7m

Construction75%
Queue EntryDec 7, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJul 22, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2028-01-09

Queue history
25INR0174 · 46 monthly ERCOT reports, Dec 2022 – Sep 2026

Projected COD moved

3 times

Jul 2025 → Jan 2028

Net change

+30 months

first report to latest

Capacity

174 → 172 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 7, 2022
Interconnection agreement signedJul 22, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Oct 14, 2027
Differs from queue: Jan 9, 2028From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
Active
Active — IA executed July 2024, tax abatement agreement under consideration as of November 2025
Financing
Not recorded

Milestones in this assessment

IA executedJul 22, 2024

ERCOT Standard Generation Interconnection Agreement executed between LCRA TSC and Concho Pearl Solar, LLC

interchange.puc.texas.gov
Permit approvedNov 2025

Concho County public hearing for restated tax abatement agreement with Concho Pearl Solar, LLC

co.concho.tx.us
COD target2027Latest in this assessment

ERCOT capacity chart lists 171.9 MW Concho Pearl Solar with 2027 target COD

ercot.com
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. interconnection.fyi/eia/project/67956-conpv
  2. gem.wiki/Concho_Pearl_Solar_and_Storage_solar_farm
  3. co.concho.tx.us/upload/page/9901/Public%20hearing%2011.13.25.PDF
  4. ercot.com/files/docs/2025/12/04/Capacity-Changes-by-Fuel-Type-Charts_November_2025.xlsx
  5. interchange.puc.texas.gov/search/documents/?controlNumber=35077&itemNumber=1888

Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-10-14. No press releases or news articles found with alternative dates; ERCOT capacity chart confirms 2027 target year.

Developer: Only entity identified is the project LLC 'Concho Pearl Solar, LLC' from LBNL filing and interconnection agreements. No parent company or operating entity disclosed in available sources.

Status: LBNL shows 'active' status with IA executed 2024-07-22. Concho County public hearing documents from November 2025 confirm ongoing tax abatement discussions, indicating active development.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Concho Pearl Solar is a proposed 171.9 MW solar generation project located in Concho County, Texas. The project, developed by Concho Pearl Solar, LLC, is interconnected within the ERCOT region under queue ID ERCOT-25INR0174. It entered the queue on December 7, 2022, and has a proposed commercial operation date of October 14, 2027.

The project's Interconnection Agreement (IA) was executed on July 22, 2024, and its interconnection point is the Tap 345kV 76009 Twin Buttes - 7077 Amos Creek. The project is currently listed as active in the interconnection queue.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Concho

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Concho Pearl Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 76009 Twin Buttes - 7077 Amos Creek

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
ANG_ALL
POI Substation
Twin Buttes Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.