Piedra Solar (ERCOT-25INR0168) — Project Summary

Queue ID
ERCOT-25INR0168
Capacity
281.7 MW
Technology
Solar+Battery
Status
active
Location
Freestone, TX
Region
ERCOT
Developer
Piedra Solar, LLC
IA Status
IA Executed

Piedra Solar

ERCOT-25INR0168BetaActiveSolarBatteryERCOTLBNL + Live

281.7 MW hybrid in Freestone, TX · In queue since September 2022 · Proposed COD January 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

281.7 MW

Capacity

1

Components

Solar

4y 2m

In Queue

IA Executed

IA Phase

Signed Jul 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 10m

IA → COD

2y 6m

Total Duration

1y 10m

Construction75%
Queue EntrySep 2, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJul 2, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-01-15

Queue history
25INR0168 · 43 monthly ERCOT reports, Mar 2023 – Sep 2026

Projected COD moved

4 times

Jun 2025 → Jan 2027

Net change

+19 months

first report to latest

Capacity

306 → 282 MW

changed in the reports

Latest stage

Synchronized

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 2, 2022
Facilities study approvedSep 17, 2025
Interconnection agreement signedJul 2, 2024
Approved for energizationJul 27, 2026
Approved for synchronizationAug 26, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 21 months ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestonegroundbreaking ceremony · 2023-04-27Ferrovial · 2025-02-07

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2026
Differs from queue: Jan 15, 2027From queue filing
Developer in saved assessment
X-ELIO
Filed as Piedra Solar, LLC
Status at research time
IA Executed
IA Executed — construction underway, less than 50% complete as of EIA data
Financing
Not recorded

Milestones in this assessment

GroundbreakingApr 27, 2023

X-ELIO and Ferrovial held groundbreaking ceremony for Piedra Solar project

newsroom.ferrovial.com
IA executedJul 2, 2024

Interconnection Agreement executed with ERCOT

interconnection.fyi
COD targetDec 22, 2026Latest in this assessment

Proposed commercial operation date per LBNL queue

interconnection.fyi
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. newsroom.ferrovial.com/en/press-releases/ferrovial-first-stone-solar-photovoltaic-project-texas/
  2. eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_05
  3. interconnection.fyi/project/ercot-25inr0168
  4. corporate.totalenergies.us/discover-our-renewables-projects

Commercial operation date: LBNL proposes 2026-12-22 COD. EIA lists project as 'Under construction, less than or equal to 50 percent complete' as of their latest data. No recent news provides an updated COD target, so LBNL date stands as best available estimate.

Developer: LBNL filing entity is 'Piedra Solar, LLC' (project shell). Ferrovial press release and news extraction confirm X-ELIO as the operating developer/owner. TotalEnergies corporate site also lists Piedra Solar under their renewables portfolio, suggesting possible ownership stake or acquisition, but X-ELIO is the primary developer cited in construction-phase sources.

Status: LBNL shows IA executed 2024-07-02. Groundbreaking occurred 2023-04-27 per Ferrovial. EIA confirms project is under construction but ≤50% complete, consistent with active construction phase.

Project lifecycle
as of 2025-02-07
PhaseConstructionFerrovial · 2025-02-07
OperationalNoFerrovial · 2025-02-07
TechnologySolarFerrovial · 2025-02-07
DeveloperX-ELIOFerrovial · 2025-02-07
EPC contractorFerrovial (Webber / Ferrovial Energy Solutions)Ferrovial · 2025-02-07
GroundbreakingAnnouncedFerrovial · 2025-02-07

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Piedra Solar is a proposed solar generation project located in Freestone County, Texas, with a total capacity of 300.93 MW. Developed by Piedra Solar, LLC, the project consists entirely of solar photovoltaic generation. It is listed in the ERCOT interconnection queue as entry ERCOT-25INR0168, with a queue entry date of September 2, 2022, and a proposed commercial operation date of December 22, 2026.

The project's interconnection agreement (IA) has been executed as of July 2, 2024. The point of interconnection (POI) is the Tap 345-kV line Navarro (68091) _x0013_ Limestone (46020). The development has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Freestone

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Piedra Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345-kV line Navarro (68091) – Limestone (46020))

Data Source

LBNL + Live

DeveloperX-ELIOFerrovial · 2025-02-07
EPC contractorFerrovialFerrovial · 2025-02-07
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Simsboro Magnolia Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.