SAHARA II BESS (SOHO II BESS) (ERCOT-25INR0162) — Project Summary

Queue ID
ERCOT-25INR0162
Capacity
204.3 MW
Technology
Battery
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
ESTX-PLD-HOUSTON2
IA Status
IA Executed

SAHARA II BESS (SOHO II BESS)

ERCOT-25INR0162BetaActiveBatteryERCOTLBNL

204.3 MW storage in Brazoria, TX · In queue since August 2022 · Proposed COD June 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

204.3 MW

Capacity

1

Components

Battery

4y 3m

In Queue

IA Executed

IA Phase

Signed Apr 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

8 months

IA → COD

3y 2m

Total Duration

8 months

Schedule

6 months past proposed COD

Construction75%
Queue EntryAug 16, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementApr 15, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2026-06-01

Queue history
25INR0162 · 47 monthly ERCOT reports, Aug 2022 – Jun 2026

Projected COD moved

4 times

Dec 2025 → Jun 2026

Net change

+6 months

first report to latest

Capacity

206 → 204 MW

changed in the reports

Latest stage

Commercial operation

last listed Jun 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 16, 2022
Facilities study approvedMay 1, 2025
Interconnection agreement signedApr 15, 2023
Approved for energizationJan 13, 2026
Approved for synchronizationFeb 3, 2026
Approved for commercial operationJul 23, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 2026
From queue filing
Developer in saved assessment
Prologis Energy
Filed as ESTX-PLD-HOUSTON2
Status at research time
Active
Active — IA executed April 2023, project on track for June 2026 COD per ERCOT capacity planning documents
Financing
Not recorded

Milestones in this assessment

IA executedApr 15, 2023

Interconnection Agreement executed with ERCOT

ftp.puc.texas.gov
COD targetJun 2026Latest in this assessment

Expected commercial operation date per ERCOT planning documents

energy-storage.news
Research sources and reasoning (6 recorded sources)

high confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas
  2. ftp.puc.texas.gov/public/puct-info/industry/electric/reports/genplant/gentable.xls
  3. ercot.com/files/docs/2025/12/05/MORA_February2026.pdf
  4. ercot.com/files/docs/2026/01/08/Capacity-Changes-by-Fuel-Type-Charts_December_2025.xlsx
  5. energy-storage.news/prologis-energy-sells-400mw-800mwh-bess-in-exas/
  6. cleanview.co/power-projects/developers/black-mountain-energy-storage

Commercial operation date: LBNL proposed COD of June 2026 is consistently confirmed across multiple independent sources including Cleanview, Texas PUC generator table, and ERCOT capacity charts through December 2025. No contradictory dates found in recent research.

Developer: LBNL filing entity 'ESTX-PLD-HOUSTON2' is a project LLC. Cleanview and other sources identify the parent as 'Prologis Logistics Services' / 'Prologis Energy', the real estate platform's energy storage division. Result 2 confirms Prologis Energy as active BESS developer in Texas.

Status: LBNL status 'Active' with IA executed is confirmed by ERCOT's December 2025 MORA report and capacity charts showing the project in planned monthly additions. No withdrawal or delay signals found.

About

Saved background

Generated Apr 10, 2026 · Predates Jun 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The SOHO II BESS project is a proposed 206.32 MW battery storage project located in Brazoria County, Texas. Developed by Black Mountain Energy Storage II, the project is interconnected within the ERCOT region and entered the ERCOT interconnection queue as queue ID ERCOT-25INR0162 on August 16, 2022.

The project has an executed Interconnection Agreement (IA) as of April 15, 2023, and is currently listed as active. The proposed commercial operation date is June 1, 2026. The point of interconnection is the 43035 Oasis 345kV.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jun 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

ESTX-PLD-HOUSTON2

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

43035 Oasis 345kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Oasis Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.