Sagewood BESS (ERCOT-25INR0142) — Project Summary

Queue ID
ERCOT-25INR0142
Capacity
100.57 MW
Technology
Battery
Status
active
Location
Glasscock, TX
Region
ERCOT
Developer
Sagewood BESS, LLC
IA Status
Facility Study

Sagewood BESS

ERCOT-25INR0142BetaActiveBatteryERCOTLBNL + Live

100.57 MW storage in Glasscock, TX · In queue since September 2022 · Proposed COD March 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

100.57 MW

Capacity

1

Components

Battery

4y 2m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 6m

Facilities Study50%
Queue EntrySep 21, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-31

Queue history
25INR0142 · 45 monthly ERCOT reports, Jan 2023 – Sep 2026

Projected COD moved

4 times

Aug 2025 → Mar 2028

Net change

+31 months

first report to latest

Capacity

101 → 101 MW

changed in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 21, 2022
Facilities study approvedAug 13, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Mar 31, 2028
From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
Active
Active — Facility Study stage in ERCOT queue, no construction or financing announcements
Financing
Not recorded

Milestones in this assessment

IA executedSep 2022Latest in this assessment

Entered ERCOT queue at Facility Study stage

cleanview.co
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/25INR0142/sagewood-bess
  2. interconnection.fyi/project/ercot-25inr0142
  3. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
  4. corporationwiki.com/p/3gk5fw/fairgreen-bess-llc

Commercial operation date: Only LBNL queue data provides a COD of March 2028. No news sources or press releases contradict or update this date. Cleanview aggregator mirrors the LBNL date.

Developer: LBNL filing entity is 'Sagewood BESS, LLC', a project-specific LLC. No press releases, corporate announcements, or news coverage identify a parent operating company. CorporationWiki results show similar LLC patterns (Fairgreen BESS, Sonata Storage, etc.) suggesting a portfolio developer structure, but no parent entity is named in available sources.

Status: LBNL status is 'active' at Facility Study stage. No news coverage indicates construction start, financing close, or withdrawal. Project remains in early interconnection phase.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Sagewood BESS project is a proposed 100.57 MW battery storage project located in Glasscock County, Texas. Developed by Sagewood BESS, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0142, with a queue entry date of September 21, 2022.

The proposed commercial operation date is March 31, 2028. The project's interconnection status is currently in the Facility Study phase.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Glasscock

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Sagewood BESS, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap McDonald Road Switch (1333) – Pastores Switch (10121) ckt 1

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.