Sun Cactus Solar (ERCOT-25INR0109) — Project Summary

Queue ID
ERCOT-25INR0109
Capacity
120.63 MW
Technology
Solar
Status
suspended
Location
Duval, TX
Region
ERCOT
Developer
Sun Cactus Solar Project, LLC
IA Status
IA Executed

Sun Cactus Solar

ERCOT-25INR0109BetaSuspendedSolarERCOTLBNL + Live

120.63 MW generation in Duval, TX · In queue since July 2022 · Proposed COD October 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

120.63 MW

Capacity

1

Components

Solar

4y 4m

In Queue

IA Executed

IA Phase

Signed Nov 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 4m

IA → COD

3y 11m

Total Duration

1y 4m

Suspended75%
Queue EntryJul 5, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementNov 6, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

Construction

Construction pending

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-10-15

Queue history
25INR0109 · 47 monthly ERCOT reports, Jun 2022 – Apr 2026

Projected COD moved

3 times

Aug 2025 → Oct 2027

Net change

+26 months

first report to latest

Capacity

122 → 121 MW

changed in the reports

Latest stage

IA signed

last listed Apr 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 5, 2022
Interconnection agreement signedNov 6, 2023
On ERCOT's inactive listMay 2026 – Sep 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Oct 15, 2027
From queue filing
Developer in saved assessment
Savion Renewable Energy
Filed as Sun Cactus Solar Project, LLC
Status at research time
Active
Active — IA executed Nov 2023, tax abatement agreement finalized Oct 2024, construction timeline unclear
Financing
Not recorded

Milestones in this assessment

IA executedNov 6, 2023

ERCOT Standard Generation Interconnection Agreement executed between AEP Texas Inc. and Sun Cactus Solar Project, LLC

elibrary.ferc.gov
Permit approvedOct 2024Latest in this assessment

Duval County tax abatement agreement finalized for 120 MWac solar facility with $148M estimated investment

co.duval.tx.us
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. caller.com/story/news/local/2022/10/24/two-major-renewable-energy-projects-coming-to-duval-county/69569571007/
  2. co.duval.tx.us/upload/page/11362/20240613_Sun%20Cactus%20Attachment%20to%20Application%20for%20Tax%20Abatement.pdf
  3. elibrary.ferc.gov/eLibrary/docinfo?accession_Number=20240109-3068&sid=3f2fa233-444b-4e87-a5c4-0277499c4be4
  4. co.duval.tx.us/upload/page/11362/20241010_Duval%20County%20Tax%20Abatement%20with%20Sun%20Cactus%20Solar%20Project%202024-10-07.pdf

Commercial operation date: LBNL queue shows October 2027 COD. No contradicting dates found in research; Corpus Christi Caller-Times (Oct 2022) mentioned construction expected to begin in 2023 but provided no updated COD target.

Developer: LBNL filing entity is 'Sun Cactus Solar Project, LLC' (project SPV). Corpus Christi Caller-Times (Oct 2022) identifies Savion Renewable Energy as the developer expecting to begin construction on Sun Cactus and Dove Run projects.

Status: LBNL shows 'Active' with IA executed Nov 2023. Duval County tax abatement agreement dated Oct 2024 confirms $148M investment commitment. No construction start or completion announcements found beyond 2022 expectation.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Sun Cactus Solar is a proposed 120.63 MW solar generation project located in Duval County, Texas. The development project is being pursued by Sun Cactus Solar Project, LLC and is listed in the interconnection queue of the Electric Reliability Council of Texas (ERCOT) under queue ID ERCOT-25INR0109. The project consists of a single solar component and would connect to the grid at a point of interconnection described as a tap on the 138 kV line between the Falfurrias (8510) and Crestonio (8695) substations.

The project entered the ERCOT interconnection queue on July 5, 2022, and executed an interconnection agreement on November 6, 2023. Its proposed commercial operation date is October 15, 2027. Despite the executed interconnection agreement, the project's current queue status is listed as suspended.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Apr 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Duval

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Sun Cactus Solar Project, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 138kV 8510 Falfurrias - 8695 Crestonio

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
FALFUR_RN
POI Substation
Falfurrias Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.