Luthor Solar (ERCOT-25INR0106) — Project Summary

Queue ID
ERCOT-25INR0106
Capacity
101 MW
Technology
Solar
Status
active
Location
Howard, TX
Region
ERCOT
Developer
TREX US Luthor LLC
IA Status
Facility Study

Luthor Solar

ERCOT-25INR0106BetaActiveSolarERCOTLBNL + Live

101 MW generation in Howard, TX · In queue since June 2022 · Proposed COD September 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

101 MW

Capacity

1

Components

Solar

4y 5m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 3m

Facilities Study50%
Queue EntryJun 27, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-09-25

Queue history
25INR0106 · 41 monthly ERCOT reports, May 2023 – Sep 2026

Projected COD moved

2 times

May 2025 → Sep 2027

Net change

+28 months

first report to latest

Capacity

103 → 101 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 27, 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Sep 2027
From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
Active
Active — Facility Study phase, no IA executed. Queue aggregator ercotqueue.com assigns 5% build probability.
Financing
Not recorded

Milestones in this assessment

IA executedLatest in this assessment

No IA executed — project remains in Facility Study phase as of queue snapshot

cleanview.co
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/solar-farms/texas/25INR0106/luthor-solar
  2. interconnection.fyi/project/ercot-25inr0106
  3. ercotqueue.com/project/25INR0106
  4. renewablesinfo.org/project/ercot-25inr0106-luthor-solar

Commercial operation date: LBNL queue snapshot shows proposed COD of September 2027. No independent news sources or press releases found to validate or contradict this date. Multiple aggregator sites (Cleanview, interconnection.fyi) echo the LBNL data without independent verification.

Developer: Only source is the LBNL filing entity 'TREX US Luthor LLC'. No press releases, corporate announcements, or news coverage found identifying the parent/operating company behind this project LLC. Unable to determine if this is a shell entity or the actual developer.

Status: LBNL status is 'active' at Facility Study stage with no IA date. No news of construction activity, financing, or permitting. Third-party queue tracker assigns low build probability, suggesting early-stage development with uncertain prospects.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Luthor Solar project is a proposed 101 MW solar generation facility located in Howard County, Texas. The project, developed by TREX US Luthor LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0106, with a queue entry date of June 27, 2022. The proposed commercial operation date is September 25, 2027, and the project's interconnection agreement status is currently in the Facility Study phase.

The Luthor Solar project has been the subject of recent news coverage, with four articles focusing on regulatory and grid-related aspects of the development.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Howard

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

TREX US Luthor LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV 23831 Luther Station – 10032 Little Luther

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Luther

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.