Goldeneye BESS (ERCOT-25INR0100) — Project Summary

Queue ID
ERCOT-25INR0100
Capacity
201.6 MW
Technology
Battery
Status
active
Location
Bell, TX
Region
ERCOT
Developer
Black Mountain Energy Storage II
IA Status
IA Executed

Goldeneye BESS

ERCOT-25INR0100BetaActiveBatteryERCOTLBNL + Live

201.6 MW storage in Bell, TX · In queue since June 2022 · Proposed COD May 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

201.6 MW

Capacity

1

Components

Battery

4y 5m

In Queue

IA Executed

IA Phase

Signed Feb 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 8m

IA → COD

4y 3m

Total Duration

1y 8m

Construction75%
Queue EntryJun 10, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementFeb 26, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-05-15

Queue history
25INR0100 · 50 monthly ERCOT reports, Aug 2022 – Sep 2026

Projected COD moved

6 times

Apr 2025 → May 2028

Net change

+37 months

first report to latest

Capacity

202 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 10, 2022
Facilities study approvedAug 18, 2023
Interconnection agreement signedFeb 26, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
May 15, 2028
From queue filing
Developer in saved assessment
Black Mountain Energy Storage II
From queue filing
Status at research time
IA Executed
IA Executed — interconnection agreement signed Feb 2024 with Oncor per Texas PUC filing 35077, no construction announcements yet
Financing
Not recorded

Milestones in this assessment

IA executedFeb 26, 2024Latest in this assessment

Generation Interconnection Agreement between Oncor Electric Delivery Company LLC and Black Mountain Energy Storage II filed with Texas PUC

interchange.puc.texas.gov
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. energy-storage.news/esvolta-acquires-300mwh-ercot-bess-from-black-mountain-energy-storage/
  2. cleanview.co/power-projects/planned/battery-storage-projects/texas/25INR0100/goldeneye-bess
  3. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  4. ercotqueue.com/project/25INR0100

Commercial operation date: LBNL queue shows proposed COD of May 2028. No press releases or news articles provide an updated target date. Cleanview aggregator mirrors the LBNL date, but no developer-sourced update exists.

Developer: LBNL filing entity is 'Black Mountain Energy Storage II'. No press releases or corporate announcements found for this specific project. The esVolta acquisition article references a different 150MW/300MWh BESS from Black Mountain Energy Storage (BMES), but capacity mismatch (150MW vs 201.6MW) indicates this is a separate project.

Status: LBNL shows IA executed 2024-02-26. Texas PUC Interchange confirms Generation Interconnection Agreement filing for Goldeneye BESS with Oncor. No subsequent construction or financing announcements found in search results.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Goldeneye BESS project is a proposed 201.6 MW battery storage project located in Bell County, Texas. Developed by Black Mountain Energy Storage II, the project entered the ERCOT interconnection queue as entry ERCOT-25INR0100 on June 10, 2022. The project's proposed commercial operation date is May 15, 2028.

The interconnection agreement for the Goldeneye BESS project has been executed as of February 26, 2024. The point of interconnection is the 3423 KILLEEN Switch 138 KV. The project is currently listed as active in the interconnection queue.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Bell

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Black Mountain Energy Storage II

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

3423 KILLEEN Switch 138 KV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.