SanPat Solar I
308.88 MW generation in San Patricio, TX · In queue since July 2022 · Proposed COD July 2027
308.88 MW
Capacity
1
Components
Solar
4y 4m
In Queue
IA Executed
IA Phase
Signed Oct 2023
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
1y 3m
IA → COD
3y 9m
Total Duration
1y 3m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 12–24 months
Proposed COD: 2027-07-08
Projected COD moved
5 times
Jul 2025 → Jul 2027
Net change
+24 months
first report to latest
Capacity
309 MW
unchanged in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection agreement executed (date from the LBNL filing); ercotqueue.com confirms IA and FIS complete.
ercotqueue.comResearch sources and reasoning (6 recorded sources)
low confidence at research time
- ercotqueue.com/project/25INR0081
- interconnection.fyi/project/ercot-25inr0081
- cleanview.co/power-projects/planned/solar-farms/texas/25INR0081/sanpat-solar-i
- futuregrid.io/interconnections/sanpat-solar-i/
- quicksandcheck.com/texas/san-patricio-county/
- interchange.puc.texas.gov/search/filings/?ControlNumber=35077&SortOrder=Ascending&Page=2
Commercial operation date: Every search result either repeats the ERCOT/LBNL date (interconnection.fyi: 'proposed completion date is July 8, 2027'; cleanview: 'Expected online 2027') or gives a nearby date (FutureGrid: 2027-05-31). No developer press release or news item gives an independent, financing-backed COD.
Developer: All aggregator sites and PUC Texas filings name Padre Solar LLC. The PUC filings show CGRP 10, LLC acting as authorized agent for Padre Solar LLC and CGRP 04, LLC, but no source identifies an operating parent, so none is asserted.
Status: ercotqueue.com reports 'IA + FIS complete' and quicksandcheck reports 'Signed; security posted', consistent with the LBNL IA Executed status. The interxdata 'operational' label conflicts with LBNL (is_operational false) and every other source, so it was discounted as an error.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The SanPat Solar I project is a proposed solar generation facility with a total capacity of 308.88 MW. Located in San Patricio County, Texas, the project is being developed by Padre Solar LLC. It is currently listed as active in the ERCOT interconnection queue under queue ID ERCOT-25INR0081, with an interconnection queue entry date of July 18, 2022. The proposed commercial operation date is July 8, 2027.
The project has an executed Interconnection Agreement (IA) as of October 18, 2023. The point of interconnection (POI) is Tap 345kV 8249 Angstrom _x0013_ 8659 Naismith. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
San Patricio
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Padre Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 8249 Angstrom – 8659 Naismith
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.