Meitner Solar (ERCOT-25INR0080) — Project Summary

Queue ID
ERCOT-25INR0080
Capacity
702.64 MW
Technology
Solar
Status
active
Location
Gray, TX
Region
ERCOT
Developer
IP Meitner, LLC
IA Status
IA Executed

Meitner Solar

ERCOT-25INR0080BetaActiveSolarERCOTLBNL + Live

702.64 MW generation in Gray, TX · In queue since August 2022 · Proposed COD June 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

702.64 MW

Capacity

1

Components

Solar

4y 3m

In Queue

IA Executed

IA Phase

Signed Jan 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 5m

IA → COD

4y 5m

Total Duration

1y 5m

Construction75%
Queue EntryAug 5, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJan 31, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-06-08

Queue history
25INR0080 · 51 monthly ERCOT reports, Jul 2022 – Sep 2026

Projected COD moved

2 times

Sep 2026 → Jun 2028

Net change

+21 months

first report to latest

Capacity

703 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 5, 2022
Interconnection agreement signedJan 31, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 8, 2028
From queue filing
Developer in saved assessment
Intersect Power
Filed as IP Meitner, LLC
Status at research time
IA Executed
Active in the ERCOT queue with IA executed 2024-01-31 and county tax abatement approved Jan 2024; no construction start or groundbreaking found in the sources.
Financing
Not recorded

Milestones in this assessment

Permit approvedJan 15, 2024

Gray County Commissioners Court approved Intersect Power's tax abatement request for the Meitner project (a local incentive approval, not a construction permit).

thepampanews.com
COD target2028Latest in this assessment

Completion proposed for 2028 per EIA-derived plant listing (consistent with the LBNL date of 2028-06-08).

interconnection.fyi
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. thepampanews.com/stories/intersect-powers-tax-abatement-request-approved-by-county-commissioners-court,66825
  2. co.gray.tx.us/upload/page/2004/2023/POWERPOINT%20Gray%20County%20Public%20Meeting%20Meitner%20Project%2012.15.23.pdf
  3. interconnection.fyi/eia/plant/68203
  4. cleanview.co/power-projects/planned/solar-farms/texas/25INR0080/meitner-solar
  5. datacenterdynamics.com/en/news/intersect-is-being-acquired-by-googles-parent-company-alphabet/

Commercial operation date: LBNL proposes COD 2028-06-08. Cleanview and interconnection.fyi both list 2028 ('Completion is proposed for 2028'), but they are likely derived from the same queue/EIA data, so they are not independent confirmation. No developer press release gives a different date.

Developer: The Gray County presentation says 'Intersect Power plans to own, construct, and operate the Meitner project', and the Pampa News tax-abatement story names Intersect Power as applicant. IP Meitner, LLC is the project shell. A Data Center Dynamics snippet says Intersect is being acquired by Alphabet, but a close isn't confirmed, so no ownership change is recorded.

Status: LBNL lists the project as active with an executed IA. The county abatement approval and later aggregator listings as 'planned' with a 2028 online date are consistent with that, and nothing indicates withdrawal or construction.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Meitner Solar is a proposed 702.64 MW solar generation project located in Gray County, Texas. The developer is IP Meitner, LLC. The project is in the ERCOT interconnection queue as entry ERCOT-25INR0080, with a queue entry date of August 5, 2022, and a proposed commercial operation date of December 20, 2027.

The project's Interconnection Agreement (IA) has been executed as of January 31, 2024. The point of interconnection is the 345 kV Gray substation (Bus# 79000). The project has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Gray

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

IP Meitner, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

345 kV Gray (Bus# 79000)

Data Source

LBNL + Live

ApplicantIntersect PowerPampa News · 2024-01-15
AgencyGray County Commissioner's CourtPampa News · 2024-01-15
RulingApprovalPampa News · 2024-01-15
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.