Sunlight Solar (ERCOT-25INR0079) — Project Summary

Queue ID
ERCOT-25INR0079
Capacity
203 MW
Technology
Solar
Status
suspended
Location
Ector, TX
Region
ERCOT
Developer
—
IA Status
—

Sunlight Solar

ERCOT-25INR0079BetaSuspendedSolarERCOTLBNL + Live

203 MW generation in Ector, TX · In queue since June 2022 · Proposed COD March 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

203 MW

Capacity

1

Components

Solar

4y 5m

In Queue

—

IA Status

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 9m

Suspended0%
Queue EntryJun 9, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-03-31

Queue history
25INR0079 · 24 monthly ERCOT reports, Jun 2022 – May 2024

Projected COD moved

3 times

Dec 2025 → Dec 2027

Net change

+24 months

first report to latest

Capacity

204 → 203 MW

changed in the reports

Latest stage

Screening started

last listed May 2024

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 10, 2022
On ERCOT's inactive listJun 2024 – Sep 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 23 months ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneconstruction beginsBay Nature · 2024-12-12
Project lifecycle
as of 2024-12-12
PhaseConstructionBay Nature · 2024-12-12
OperationalNoBay Nature · 2024-12-12
TechnologySolarBay Nature · 2024-12-12
DeveloperIntersect PowerBay Nature · 2024-12-12
PPA offtakerSan FranciscoBay Nature · 2024-12-12
Permit decisionGrantedBay Nature · 2024-12-12

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Sunlight Solar is a proposed 203 MW solar generation project located in Ector County, Texas. The development project is in the ERCOT interconnection queue as entry ERCOT-25INR0079, with a queue entry date of June 10, 2022. The project's status is currently listed as suspended.

Sunlight Solar has been the subject of recent news coverage, with nine articles categorized as relating to industry and regulatory matters.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: May 2024.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Ector

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

—

Utility

—

Entity

ERCOT

Service Type

—

Data Source

LBNL + Live

DeveloperIntersect PowerBay Nature · 2024-12-12
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles