SanPat Solar II (ERCOT-25INR0052) — Project Summary

Queue ID
ERCOT-25INR0052
Capacity
256.23 MW
Technology
Solar
Status
active
Location
San Patricio, TX
Region
ERCOT
Developer
CGRP 04, LLC
IA Status
IA Executed

SanPat Solar II

ERCOT-25INR0052BetaActiveSolarERCOTLBNL + Live

256.23 MW generation in San Patricio, TX · In queue since February 2022 · Proposed COD July 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

256.23 MW

Capacity

1

Components

Solar

4y 9m

In Queue

IA Executed

IA Phase

Signed Oct 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 8m

IA → COD

3y 9m

Total Duration

1y 8m

Construction75%
Queue EntryFeb 28, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 18, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-07-22

Queue history
25INR0052 · 51 monthly ERCOT reports, Jul 2022 – Sep 2026

Projected COD moved

5 times

Jul 2025 → Jul 2027

Net change

+24 months

first report to latest

Capacity

256 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 28, 2022
Facilities study approvedJul 9, 2026
Interconnection agreement signedOct 18, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
2027
From queue filing
Developer in saved assessment
Bechtel
Filed as CGRP 04, LLC
Status at research time
Active
Active — IA executed Oct 2023, FIS pending per ercotqueue.com, capacity reduced from original 308.88 MW to 256.23 MW
Financing
Not recorded

Milestones in this assessment

IA executedOct 18, 2023

Interconnection Agreement executed with AEP Texas

interchange.puc.texas.gov
COD targetJul 2027Latest in this assessment

Current COD target per ERCOT capacity tracking

ercot.com
Research sources and reasoning (6 recorded sources)

medium confidence at research time

  1. southtexasnews.com/san_patricio_county/news/port-to-establish-solar-farm-in-san-pat-county/article_2392d2bc-2894-11ed-b4a1-6f2d3b37c8b1.html
  2. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&ItemMatch=Equal&DocumentType=ALL&SortBy=FilingParty&SortOrder=Ascending
  3. cleanview.co/power-projects/developers/betchel
  4. ercot.com/files/docs/2024/09/06/Capacity-Changes-by-Fuel-Type-Charts_August_2024.xlsx
  5. ercot.com/files/docs/2023/11/13/Capacity-Changes-by-Fuel-Type-Charts_October_2023_Corrected.xlsx
  6. assets.comptroller.texas.gov/ch313/1938/1938-gregory-cgrd-app.pdf

Commercial operation date: LBNL queue shows 2027-07-22 COD. ERCOT capacity chart from Sep 2024 shows 2026 target, while Nov 2023 ERCOT chart showed 2025 with higher capacity (308.88 MW vs current 256.23 MW). The project appears to have been re-scoped and the COD pushed back, with LBNL's 2027 date being most current.

Developer: LBNL filing entity is CGRP 04, LLC (formed Dec 6, 2021 per Texas Comptroller filing). Cleanview pipeline data lists both SanPat Solar I and II under Bechtel's development portfolio, indicating CGRP 04 is a project SPV for Bechtel.

Status: LBNL shows 'active' status with IA executed 2023-10-18. Multiple ERCOT filings and queue trackers confirm ongoing active status with interconnection agreements in place.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The SanPat Solar II project is a proposed solar generation facility with a total capacity of 256.23 MW. Located in San Patricio County, Texas, the project is being developed by CGRP 04, LLC. It is currently listed as active in the ERCOT interconnection queue under queue ID ERCOT-25INR0052, with an interconnection queue entry date of February 28, 2022.

The proposed commercial operation date for SanPat Solar II is July 22, 2027. An Interconnection Agreement (IA) for the project has been executed as of October 18, 2023. The point of interconnection (POI) is Tap 345kV 8249 Angstrom _x0013_ 8659 Naismith.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

San Patricio

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

CGRP 04, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 8249 Angstrom – 8659 Naismith

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.