Alamosa Solar (ERCOT-25INR0012) — Project Summary

Queue ID
ERCOT-25INR0012
Capacity
209.48 MW
Technology
Solar
Status
suspended
Location
Wilbarger, TX
Region
ERCOT
Developer
—
IA Status
—

Alamosa Solar

ERCOT-25INR0012BetaSuspendedSolarERCOTLBNL + Live

209.48 MW generation in Wilbarger, TX · In queue since December 2020 · Proposed COD January 2025

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

209.48 MW

Capacity

1

Components

Solar

5y 11m

In Queue

—

IA Status

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 1m

Suspended0%
Queue EntryDec 2, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-01-01

Queue history
25INR0012 · 33 monthly ERCOT reports, Aug 2021 – Apr 2024

Projected COD moved

0 times

Jan 2025 → Jan 2025

Net change

0 months

first report to latest

Capacity

417 → 209 MW

changed in the reports

Latest stage

Screening started

last listed Apr 2024

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 3, 2020
On ERCOT's inactive listMay 2024 – Sep 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestone1041 permit waivers approved · 2007-05Alamosa Citizen · 2025-11-12
Expected COD2028Alamosa Citizen · 2025-11-12
Project lifecycle
as of 2025-11-12
OperationalNoAlamosa Citizen · 2025-11-12
TechnologyHybridAlamosa Citizen · 2025-11-12
DeveloperNextEra EnergyAlamosa Citizen · 2025-11-12
Permit decisionconditionalAlamosa Citizen · 2025-11-12

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Alamosa Solar project is a proposed 209.48 MW solar generation facility in Wilbarger County, Texas. The project, under development in the ERCOT region, entered the ERCOT interconnection queue as queue ID ERCOT-25INR0012 on December 3, 2020. Its status is currently listed as suspended.

The Alamosa Solar project has been the subject of recent news coverage, with 12 articles categorized under the industry sector.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Apr 2024.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Wilbarger

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

—

Utility

—

Entity

ERCOT

Service Type

—

Data Source

LBNL + Live

DeveloperNextEra Energy±Alamosa Citizen · 2025-11-12
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (2)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.