Nockenut Springs Solar 3 (ERCOT-25INR0010) — Project Summary

Queue ID
ERCOT-25INR0010
Capacity
201.4 MW
Technology
Solar
Status
active
Location
Gonzales, TX
Region
ERCOT
Developer
Pecan Springs Energy, LLC
IA Status
Facility Study

Nockenut Springs Solar 3

ERCOT-25INR0010BetaActiveSolarERCOTLBNL + Live

201.4 MW generation in Gonzales, TX · In queue since September 2020 · Proposed COD June 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

201.4 MW

Capacity

1

Components

Solar

6y 2m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 9m

Facilities Study50%
Queue EntrySep 25, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-05

Queue history
25INR0010 · 73 monthly ERCOT reports, Sep 2020 – Sep 2026

Projected COD moved

2 times

Dec 2025 → Jun 2029

Net change

+42 months

first report to latest

Capacity

203 → 201 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 25, 2020

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jun 2029
From queue filing
Developer in saved assessment
Pecan Springs Energy, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, no IA executed. Build probability assessed as low (5%) by queue trackers.
Financing
Not recorded

Milestones in this assessment

COD targetMay 2027Latest in this assessment

Original proposed COD of May 2027 pushed back to June 2029

interconnectionfyi.substack.com
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/solar-farms/texas/25INR0010/nockenut-springs-solar-3
  2. interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-db7
  3. ercotqueue.com/project/25INR0010
  4. renewablesinfo.org/project/ercot-25inr0010-nockenut-springs-solar-3

Commercial operation date: LBNL proposes June 2029 COD. Interconnection.fyi notes the target was pushed back from May 2027 to June 2029, confirming the current LBNL date. No independent developer announcements found to validate or contradict.

Developer: Only LBNL filing identifies developer as 'Pecan Springs Energy, LLC'. No press releases, corporate websites, or news coverage found to confirm parent company or verify if this is a project LLC vs. operating entity.

Status: LBNL shows 'Active' status in Facility Study phase with no IA date. Third-party queue tracker (ercotqueue.com) assigns 5% build-chance, suggesting early-stage project with uncertain viability.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Nockenut Springs Solar 3 project is a proposed solar generation facility with a total capacity of 203.39 MW. It is located in Gonzales County, Texas, and is being developed by Pecan Springs Energy, LLC. The project is currently active in the ERCOT interconnection queue under queue ID ERCOT-25INR0010, with an interconnection queue entry date of September 25, 2020.

The proposed commercial operation date for Nockenut Springs Solar 3 is June 5, 2029. The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the tap 345kV 5133 Elm Creek - 5915 STP ckt 1.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Gonzales

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Pecan Springs Energy, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 345kV 5133 Elm Creek - 5915 STP ckt 1

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Elm Creek Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.