Nockenut Springs Solar 3
201.4 MW generation in Gonzales, TX · In queue since September 2020 · Proposed COD June 2029
201.4 MW
Capacity
1
Components
Solar
6y 2m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
8y 9m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-05
Projected COD moved
2 times
Dec 2025 → Jun 2029
Net change
+42 months
first report to latest
Capacity
203 → 201 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Original proposed COD of May 2027 pushed back to June 2029
interconnectionfyi.substack.comResearch sources and reasoning (4 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/solar-farms/texas/25INR0010/nockenut-springs-solar-3
- interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-db7
- ercotqueue.com/project/25INR0010
- renewablesinfo.org/project/ercot-25inr0010-nockenut-springs-solar-3
Commercial operation date: LBNL proposes June 2029 COD. Interconnection.fyi notes the target was pushed back from May 2027 to June 2029, confirming the current LBNL date. No independent developer announcements found to validate or contradict.
Developer: Only LBNL filing identifies developer as 'Pecan Springs Energy, LLC'. No press releases, corporate websites, or news coverage found to confirm parent company or verify if this is a project LLC vs. operating entity.
Status: LBNL shows 'Active' status in Facility Study phase with no IA date. Third-party queue tracker (ercotqueue.com) assigns 5% build-chance, suggesting early-stage project with uncertain viability.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Nockenut Springs Solar 3 project is a proposed solar generation facility with a total capacity of 203.39 MW. It is located in Gonzales County, Texas, and is being developed by Pecan Springs Energy, LLC. The project is currently active in the ERCOT interconnection queue under queue ID ERCOT-25INR0010, with an interconnection queue entry date of September 25, 2020.
The proposed commercial operation date for Nockenut Springs Solar 3 is June 5, 2029. The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the tap 345kV 5133 Elm Creek - 5915 STP ckt 1.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Gonzales
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Pecan Springs Energy, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 345kV 5133 Elm Creek - 5915 STP ckt 1
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- POI Substation
- Elm Creek Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
RP SCG Texas Solar
Summary analysis with parallel narrative sections and visualizations.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.