COYOTE SPRINGS AGR1
9.95 MW generation in Reeves, TX · Proposed COD June 2026
9.95 MW
Capacity
1
Components
Oil
—
In Queue
IA Executed
IA Phase
Signed Oct 2023
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
IA → COD
2y 8m
Schedule
5 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–36 months
Proposed COD: 2026-06-23
Projected COD moved
3 times
Jun 2024 → Jun 2026
Net change
+24 months
first report to latest
Capacity
10 MW
unchanged in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
About
Generated Apr 10, 2026 · Predates Sep 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The COYOTE SPRINGS AGR1 project is a proposed 9.95 MW generation project in Reeves County, Texas. The project, developed by HEN INFRASTRUCTURE, LLC 1, is fueled by oil. It is listed in the ERCOT interconnection queue as entry ERCOT-24INR0645. The proposed commercial operation date is January 8, 2025.
The project's interconnection agreement (IA) was executed on October 16, 2023, and its IA status is listed as "IA Executed".
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Reeves
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
HEN INFRASTRUCTURE, LLC 1
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Station Name: COYOTSPR Load Name: COYOTE_1 Bus#: 38113 Voltage: 138 kV DAC: COYOTSPR_LD8 COYOTSPR/COYOTE_1/38113/COYOTSPR_LD8
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
COYOTE SPRINGS AGR1
Data-driven briefing on COYOTE SPRINGS AGR1 — fleet, generation, financial, and news signals.
Coyote Springs
Data-driven briefing on Coyote Springs — fleet, generation, financial, and news signals.
Coyote Springs (TX)
Data-driven briefing on Coyote Springs — fleet, generation, financial, and news signals.
Coyote
Data-driven briefing on Coyote — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.