Megacharge BESS
110 MW storage in Cameron, TX · In queue since June 2023 · Proposed COD July 2028
110 MW
Capacity
1
Components
Battery
3y 5m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 1m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-07-01
Projected COD moved
3 times
Sep 2024 → Jul 2028
Net change
+46 months
first report to latest
Capacity
110 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Proposed commercial operation date per ERCOT queue filing
cleanview.coResearch sources and reasoning (4 recorded sources)
low confidence at research time
- energy-storage.news/sm-energy-secures-us135-million-for-160mw320mwh-bess/
- cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0572/megacharge-bess
- ercotqueue.com/developer/smt-harlingen-iii-llc
- interconnection.fyi/project/ercot-26inr0186
Commercial operation date: LBNL queue snapshot shows proposed COD of July 2027. No independent news sources provide alternative dates for this specific project (24INR0572 in Cameron County). Cleanview aggregator mirrors LBNL data.
Developer: LBNL filing entity is 'SMT Harlingen III LLC' (project-specific shell). Energy-Storage.News article identifies parent company as 'SMT Energy' which secured $135M financing for a different ERCOT BESS project, establishing SMT Energy as the operating developer.
Status: LBNL shows 'active' status at Facility Study stage. No news indicates construction activity, withdrawal, or status change. Project remains in pre-construction interconnection phase.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Harlingen III BESS project is a proposed 110 MW battery storage project located in Cameron County, Texas. Developed by SMT Harlingen III LLC, the project entered the ERCOT interconnection queue as queue ID ERCOT-24INR0572 on June 28, 2023. The proposed commercial operation date is July 1, 2027, and its interconnection status is currently in the Facility Study phase.
The Harlingen III BESS project has been the subject of recent news coverage, with seven articles related to the project appearing in the news. These articles cover topics such as deals, grid infrastructure, and regulatory matters.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Cameron
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
SMT Harlingen III LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
8320 WEST HARLINGEN 69kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- W_HRL_ESR_RN
- POI Substation
- West Harlingen Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.