Thomas Cameron BESS (ERCOT-24INR0543) — Project Summary

Queue ID
ERCOT-24INR0543
Capacity
201.52 MW
Technology
Battery
Status
active
Location
Lampasas, TX
Region
ERCOT
Developer
Thomas Cameron BESS LLC
IA Status
IA Executed

Thomas Cameron BESS

ERCOT-24INR0543BetaActiveBatteryERCOTLBNL + Live

201.52 MW storage in Lampasas, TX · In queue since June 2023 · Proposed COD April 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

201.52 MW

Capacity

1

Components

Battery

3y 5m

In Queue

IA Executed

IA Phase

Signed Oct 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 4m

IA → COD

4y 6m

Total Duration

1y 4m

Construction75%
Queue EntryJun 7, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 30, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2029-04-28

Queue history
24INR0543 · 40 monthly ERCOT reports, Jun 2023 – Sep 2026

Projected COD moved

3 times

Nov 2024 → Apr 2029

Net change

+53 months

first report to latest

Capacity

201 → 206 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 7, 2023
Facilities study approvedJul 23, 2024
Interconnection agreement signedOct 30, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2026
Differs from queue: Apr 28, 2029
Developer in saved assessment
Enfinity Global
Filed as Thomas Cameron BESS LLC
Status at research time
Active
Active — IA executed Oct 2024 with Oncor, construction expected to begin 2025, facing local opposition from Lampasas County residents and commissioners as of early 2026
Financing
Secured
Minority equity investment from Daiwa Energy & Infrastructure closed June 2025; amount undisclosed. Partnership with Gotion High-Tech (battery supplier) also announced.
Ownership history
  1. 2025-06·Enfinity Global (100%)→Enfinity Global (majority) + Daiwa Energy & Infrastructure (minority)energy-storage.news

Milestones in this assessment

IA executedOct 30, 2024

Standard Generation Interconnection Agreement executed with Oncor Electric Delivery Company

interchange.puc.texas.gov
Groundbreaking2025

Construction expected to begin in 2025 per Daiwa press release

daiwa-ei.jp
Financing closeJun 9, 2025

Daiwa Energy & Infrastructure acquires minority stake from Enfinity Global

energy-storage.news
COD target2026Latest in this assessment

Project expected to go live in 2026

solarstoragextra.com
Research sources and reasoning (5 recorded sources)

high confidence at research time

  1. energy-storage.news/japans-daiwa-invests-in-enfinity-global-battery-storage-projects-in-us-europe/
  2. solarstoragextra.com/daiwa-acquires-enfinitys-texas-and-italy-bess-projects/
  3. daiwa-ei.jp/news-pdf/20240422e.pdf
  4. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  5. lampasasdispatchrecord.com/news/lometa-couple-sound-alarm-over-battery-storage-plant

Commercial operation date: LBNL shows May 2027 COD, but Daiwa Energy & Infrastructure's April 2024 press release states 'Expected beginning of construction 2025' with the project 'expected to go live in 2026' per Solar Storage Extra. Multiple 2026 local news articles refer to 'the future Thomas Cameron BESS' as imminent, consistent with 2026 target.

Developer: LBNL filing entity is 'Thomas Cameron BESS LLC' (project SPV). Energy-Storage.News and Solar Storage Extra report that Daiwa Energy & Infrastructure acquired a minority stake in this project from Enfinity Global in June 2025, identifying Enfinity as the IPP/developer with Daiwa as financial partner.

Status: LBNL status is 'active' with IA executed Oct 30, 2024. Texas PUC filings confirm Standard Generation Interconnection Agreement with Oncor. Local news shows ongoing community opposition but no project cancellation.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Thomas Cameron BESS project is a proposed 201.52 MW battery storage project located in Lampasas County, Texas. Developed by Thomas Cameron BESS LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0543, with a queue entry date of June 7, 2023, and a proposed commercial operation date of May 3, 2027.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 345kV 3424 BUCKHORN SWITCH - 3422 KILLEEN SWITCH. The project has appeared in recent news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Lampasas

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Thomas Cameron BESS LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 3424 BUCKHORN SWITCH - 3422 KILLEEN SWITCH

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.