Blanquilla BESS (ERCOT-24INR0528) — Project Summary

Queue ID
ERCOT-24INR0528
Capacity
200.78 MW
Technology
Battery
Status
active
Location
Nueces, TX
Region
ERCOT
Developer
Blanquilla BESS LLC
IA Status
IA Executed

Blanquilla BESS

ERCOT-24INR0528BetaActiveBatteryERCOTLBNL + Live

200.78 MW storage in Nueces, TX · In queue since February 2023 · Proposed COD May 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

200.78 MW

Capacity

1

Components

Battery

3y 9m

In Queue

IA Executed

IA Phase

Signed Sep 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 7m

IA → COD

3y 8m

Total Duration

1y 7m

Construction75%
Queue EntryFeb 9, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementSep 5, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-05-19

Queue history
24INR0528 · 43 monthly ERCOT reports, Mar 2023 – Sep 2026

Projected COD moved

6 times

Dec 2024 → May 2028

Net change

+41 months

first report to latest

Capacity

200 → 201 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 9, 2023
Facilities study approvedMar 13, 2025
Interconnection agreement signedSep 5, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Dec 15, 2027
Differs from queue: May 19, 2028From queue filing
Developer in saved assessment
Blanquilla BESS LLC
From queue filing
Status at research time
IA Executed
IA Executed — interconnection agreement signed 2024-09-05, FIS (Facility Interconnection Study) pending per ercotqueue.com
Financing
Not recorded

Milestones in this assessment

IA executedSep 5, 2024

ERCOT Standard Generation Interconnection Agreement executed between LCRA Transmission Services Corporation and Blanquilla BESS LLC

interchange.puc.texas.gov
COD targetDec 15, 2027Latest in this assessment

ERCOT capacity chart confirms 2027 commercial operation target for 200.8 MW battery project

ercot.com
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  2. ercot.com/files/docs/2025/12/04/Capacity-Changes-by-Fuel-Type-Charts_November_2025.xlsx
  3. ercot.com/files/docs/2025/06/06/Capacity-Changes-by-Fuel-Type-Charts_May_2025_PlannedMonthly.xlsx
  4. ercotqueue.com/project/24INR0528
  5. govinfo.gov/content/pkg/FR-2026-01-13/pdf/2026-00436.pdf

Commercial operation date: LBNL queue shows 2027-12-15 COD. ERCOT capacity charts from May 2025 show 2026 target, but December 2025 chart reverts to 2027, confirming LBNL date remains current. No developer press releases found to contradict.

Developer: All sources consistently identify developer as Blanquilla BESS LLC. No parent company or operating entity identified in search results. FERC filing (EG26-32-000) confirms LLC as the legal entity. No evidence of shell-LLC structure or acquisition.

Status: LBNL shows IA executed 2024-09-05. Texas PUC filings confirm Standard Generation Interconnection Agreement between LCRA TSC and Blanquilla BESS LLC. Project remains active in queue with no withdrawal signals.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Blanquilla BESS project is a proposed 200.78 MW battery storage project located in Nueces County, Texas. The developer is Blanquilla BESS LLC. It is interconnected within the ERCOT region under queue ID ERCOT-24INR0528, with a queue entry date of February 9, 2023, and a proposed commercial operation date of March 29, 2027.

The project's Interconnection Agreement (IA) has been executed as of September 5, 2024. The point of interconnection (POI) is Tap 138kV 8452 LON_HILL4A - 8441 NUECES_B4A.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Nueces

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Blanquilla BESS LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV 8452 LON_HILL4A - 8441 NUECES_B4A

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.