Corralitos Wind 1 (ERCOT-24INR0505) — Project Summary

Queue ID
ERCOT-24INR0505
Capacity
196.1 MW
Technology
Wind
Status
active
Location
Zapata, TX
Region
ERCOT
Developer
Vaquero Wind Energy, LLC
IA Status
IA Executed

Corralitos Wind 1

ERCOT-24INR0505BetaActiveWindERCOTLBNL + Live

196.1 MW generation in Zapata, TX · In queue since January 2023 · Proposed COD December 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

196.1 MW

Capacity

1

Components

Wind

3y 10m

In Queue

IA Executed

IA Phase

Signed Jun 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 5m

IA → COD

2y 6m

Total Duration

2y 5m

Construction75%
Queue EntryJan 30, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJun 19, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2027-12-01

Queue history
24INR0505 · 45 monthly ERCOT reports, Jan 2023 – Sep 2026

Projected COD moved

3 times

Mar 2024 → Dec 2027

Net change

+45 months

first report to latest

Capacity

196 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 30, 2023
Interconnection agreement signedJun 19, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 1, 2027
From queue filing
Developer in saved assessment
Vaquero Wind Energy, LLC
From queue filing
Status at research time
IA Executed
IA Executed — Facility Study pending per ercotqueue.com, active in queue with 2027 COD target
Financing
Not recorded

Milestones in this assessment

IA executedJun 19, 2025

Interconnection Agreement executed with ERCOT

interconnection.fyi
COD targetDec 2027Latest in this assessment

Proposed commercial operation date per ERCOT capacity planning

ercot.com
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. interconnection.fyi/project/ercot-24inr0505
  2. interchange.puc.texas.gov/search/filings/?ControlNumber=35077&ItemMatch=0&SortBy=FileStamp&SortOrder=Descending&Page=1
  3. ercot.com/files/docs/2026/01/08/Capacity-Changes-by-Fuel-Type-Charts_December_2025.xlsx
  4. ercotqueue.com/developer/vaquero-wind-energy-llc

Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-12-01, confirmed in ERCOT's January 2026 capacity chart listing 2027 target. No contradictory news sources found.

Developer: LBNL filing entity 'Vaquero Wind Energy, LLC' appears to be the operating company based on consistent usage across ERCOT queue databases and PUC filings. No parent company or shell-LLC structure identified in available sources.

Status: LBNL shows IA executed on 2025-06-19 with active status. ERCOT queue databases confirm project remains active with Facility Study stage pending.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Corralitos Wind 1 is a proposed 196.1 MW wind generation project located in Zapata County, Texas. The developer is Vaquero Wind Energy, LLC. The project is in the ERCOT interconnection queue as entry ERCOT-24INR0505, with a queue entry date of January 30, 2023, and a proposed commercial operation date of December 1, 2027. Its interconnection agreement status is currently in the Facility Study phase.

The point of interconnection for Corralitos Wind 1 is the Tap 345kV 80225 CENIZO7C - 80307 DELSOL7C at the New ETT Tiempo Substation. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Zapata

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Vaquero Wind Energy, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 80225 CENIZO7C - 80307 DELSOL7C (New ETT Tiempo Substation)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.