Medina Lake BESS (ERCOT-24INR0499) — Project Summary

Queue ID
ERCOT-24INR0499
Capacity
9.8 MW
Technology
Battery
Status
active
Location
Bandera, TX
Region
ERCOT
Developer
Regis Medina Lake LLC
IA Status
IA Executed

Medina Lake BESS

ERCOT-24INR0499BetaActiveBatteryERCOTLBNL

9.8 MW storage in Bandera, TX · In queue since November 2022 · Proposed COD December 2025

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

9.8 MW

Capacity

1

Components

Battery

4 years

In Queue

IA Executed

IA Phase

Signed Jan 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2 months

IA → COD

2y 11m

Total Duration

2 months

Schedule

11 months past proposed COD

Construction75%
Queue EntryNov 29, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJan 18, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2025-12-20

Queue history
24INR0499 · 27 monthly ERCOT reports, Jan 2024 – Mar 2026

Projected COD moved

6 times

Aug 2024 → Apr 2026

Net change

+20 months

first report to latest

Capacity

10 MW

unchanged in the reports

Latest stage

Commercial operation

last listed Mar 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Interconnection agreement signedJan 18, 2023
Approved for energizationFeb 4, 2025
Approved for synchronizationApr 1, 2025
Approved for commercial operationApr 6, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Medina Lake BESS project is a proposed 9.8 MW battery storage project located in Bandera County, Texas. Developed by Regis Medina Lake LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-24INR0499. The project entered the interconnection queue on November 29, 2022, and has a proposed commercial operation date of June 14, 2025.

The project's Interconnection Agreement (IA) has been executed as of January 18, 2023.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Mar 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Bandera

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Regis Medina Lake LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Station Name (TDSP Station Code) MEDILA; Load/Load Transformer Name T2; PTI BUS number 7432; Voltage in kV (Transmission Level) 138kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
MEDILA_RN
POI Substation
Medina Lake Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.