Crowned Heron BESS 2
154.2 MW storage in Fort Bend, TX · In queue since November 2022 · Proposed COD October 2026
154.2 MW
Capacity
1
Components
Battery
4 years
In Queue
IA Executed
IA Phase
Signed Aug 2024
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
1y 9m
IA → COD
2y 2m
Total Duration
1y 9m
Schedule
2 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 6–18 months
Proposed COD: 2026-10-02
Projected COD moved
5 times
Dec 2024 → Oct 2026
Net change
+22 months
first report to latest
Capacity
150 → 154 MW
changed in the reports
Latest stage
Synchronized
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Research sources and reasoning (5 recorded sources)
high confidence at research time
- rwe.com/en/press/rwe-clean-energy/2024-10-02-rwe-starts-construction-of-450-mw-bess-in-the-us/
- energy-storage.news/rwe-breaks-ground-on-900mwh-of-ercot-bess/
- industrialinfo.com/iirenergy/industry-news/article/rwe-breaks-ground-on-three-texas-bess-projects--335235
- interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
- ercot.com/files/docs/2025/11/06/Capacity-Changes-by-Fuel-Type-Charts_October_2025_PlannedMonthly.xlsx
Commercial operation date: RWE's October 2024 press release states construction began on Crowned Heron 1 and 2 with 'commissioning planned for 2025,' contradicting LBNL's July 2026 target. The ERCOT capacity chart from November 2025 still shows 2026, suggesting the project may have slipped from the original 2025 target but is likely earlier than mid-2026.
Developer: LBNL lists 'RWE Renewables' as developer, but Texas PUC filings show the legal entity as 'RWE Solar Development, LLC' (a project SPV). The parent operating company is RWE Clean Energy (US subsidiary of RWE AG), which announced and is executing the project.
Status: Multiple October 2024 sources confirm RWE broke ground on Crowned Heron 1 and 2 alongside Cartwheel BESS. LBNL status 'active' with IA executed is accurate for queue position, but ground reality is construction underway since Q4 2024.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Crowned Heron BESS 2 is a proposed 154.2 MW battery storage project located in Fort Bend County, Texas. The project, developed by RWE Renewables, is interconnected within the ERCOT region under queue ID ERCOT-24INR0493. It entered the interconnection queue on November 23, 2022, with a proposed commercial operation date of March 31, 2026.
The project's Interconnection Agreement (IA) has been executed as of August 20, 2024. The point of interconnection (POI) is the WA Parish 345 kV Bus #44000. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Fort Bend
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
RWE Renewables
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
WA Parish 345 kV Bus #44000
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- RABSMR01
- POI Substation
- W. A. Parish Station (345 kV)
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.