Rutile BESS (ERCOT-24INR0485) — Project Summary

Queue ID
ERCOT-24INR0485
Capacity
100.65 MW
Technology
Battery
Status
active
Location
Runnels, TX
Region
ERCOT
Developer
Rutile BESS, LLC
IA Status
IA Executed

Rutile BESS

ERCOT-24INR0485BetaActiveBatteryERCOTLBNL + Live

100.65 MW storage in Runnels, TX · In queue since January 2023 · Proposed COD March 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

100.65 MW

Capacity

1

Components

Battery

3y 10m

In Queue

IA Executed

IA Phase

Signed Jul 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 6m

IA → COD

2y 8m

Total Duration

2y 6m

Construction75%
Queue EntryJan 23, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJul 17, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-03-31

Queue history
24INR0485 · 41 monthly ERCOT reports, May 2023 – Sep 2026

Projected COD moved

3 times

Dec 2025 → Mar 2028

Net change

+27 months

first report to latest

Capacity

101 → 101 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 23, 2023
Facilities study approvedOct 20, 2025
Interconnection agreement signedJul 17, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Mar 31, 2028
From queue filing
Developer in saved assessment
Korea Southern Power (KOSPO)
Filed as Rutile BESS, LLC
Status at research time
IA Executed
IA Executed (July 2025) — construction commenced Jan 2026 with groundbreaking ceremony led by KOSPO
Financing
Secured
$120 million project investment by KOSPO; HD Hyundai Electric secured $100.5M EPC contract (Sep 2025)

Milestones in this assessment

IA executedJul 17, 2025

Interconnection Agreement executed with ERCOT

koreaherald.com
Financing closeSep 2025

HD Hyundai Electric awarded $100.5M BESS EPC contract

koreaherald.com
GroundbreakingJan 23, 2026

KOSPO held groundbreaking ceremony for 200 MWh Rutile BESS project

mk.co.kr
COD targetMar 31, 2028Latest in this assessment

Expected commercial operation date per ERCOT queue

cleanview.co
Research sources and reasoning (6 recorded sources)

high confidence at research time

  1. koreaherald.com/article/10569535
  2. mk.co.kr/en/business/11944033
  3. biz.chosun.com/en/en-industry/2025/09/05/HAGJX55DJ5FYFGHR2ZPAO2JKQQ/
  4. linkedin.com/posts/hd-hyundaielectric_hd-hyundai-electric-co-ltd-activity-7421817059539369984-Sp0e
  5. runnelscounty.org/upload/page/5996/docs/Rutile%20BESS%20LLC%20information.pdf
  6. cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0485/rutile-bess

Commercial operation date: LBNL proposed COD of March 2028 aligns with Cleanview tracking data and no contradictory signals in recent news. Groundbreaking occurred Jan 2026, supporting a 2028 timeline.

Developer: LBNL filing entity is 'Rutile BESS, LLC' (Cerritos, CA shell). Maeil Business reports KOSPO held groundbreaking ceremony Jan 23, 2026 and is leading the $120M project investment.

Status: LBNL shows IA executed July 17, 2025. Multiple sources confirm groundbreaking Jan 23, 2026, indicating active construction phase.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Rutile BESS is a proposed 100.65 MW battery storage project located in Runnels County, Texas. Developed by Rutile BESS, LLC, the project consists entirely of battery storage. It is currently in the ERCOT interconnection queue as entry ERCOT-24INR0485, with a queue entry date of January 23, 2023, and a proposed commercial operation date of March 31, 2028. The project's interconnection status is currently in the Facility Study phase.

The proposed project would connect to the grid at Tap 138kV 6340 BALLINGER - 60399 WEISS. Rutile BESS has been mentioned in recent news coverage related to the energy industry.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Runnels

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Rutile BESS, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV 6340 BALLINGER - 60399 WEISS

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Ballinger Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.