Lupinus Solar 3 (ERCOT-24INR0484) — Project Summary

Queue ID
ERCOT-24INR0484
Capacity
100.8 MW
Technology
Solar+Battery
Status
active
Location
Franklin, TX
Region
ERCOT
Developer
Lupinus Solar 2, LLC
IA Status
IA Executed

Lupinus Solar 3

ERCOT-24INR0484BetaActiveSolarBatteryERCOTLBNL

100.8 MW hybrid in Franklin, TX · In queue since September 2023 · Proposed COD September 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

100.8 MW

Capacity

1

Components

Solar

3y 2m

In Queue

IA Executed

IA Phase

Signed Mar 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 6m

IA → COD

1y 6m

Total Duration

1y 6m

Schedule

2 months past proposed COD

Construction75%
Queue EntrySep 23, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementMar 4, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2026-09-21

Queue history
24INR0484 · 29 monthly ERCOT reports, Sep 2023 – Jan 2026

Projected COD moved

0 times

Sep 2026 → Sep 2026

Net change

0 months

first report to latest

Capacity

101 MW

unchanged in the reports

Latest stage

Cancelled

last listed Jan 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 23, 2023
Facilities study approvedJun 26, 2024
Interconnection agreement signedMar 4, 2025
CancelledMay 15, 2026
On ERCOT's inactive listFeb 2026 – Apr 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Sep 2026
From queue filing
Developer in saved assessment
Sunraycer Renewables
Filed as Lupinus Solar 2, LLC
Status at research time
IA Executed
IA Executed (March 2025) — Construction started March 2026, financing closed May 2026 ($901M facility), on track for Q3 2026 COD
Financing
Secured
$901 million project financing closed May 2026 with five banks for three-project Texas portfolio including Lupinus sites; PPAs signed with Google

Milestones in this assessment

IA executedMar 4, 2025

Interconnection Agreement executed with ERCOT

interconnectionfyi.substack.com
GroundbreakingMar 17, 2026

Construction started on Lupinus I & II solar+storage projects in Franklin County

prnewswire.com
Financing closeMay 15, 2026

$901M financing closed with five banks for 473 MWh BESS portfolio including Lupinus projects

pv-magazine-usa.com
COD targetSep 2026Latest in this assessment

Target commercial operation date per LBNL queue and construction timeline

prnewswire.com
Research sources and reasoning (8 recorded sources)

high confidence at research time

  1. prnewswire.com/news-releases/sunraycer-celebrates-start-of-construction-of-lupinus-i--ii-and-eagle-springs-solar--storage-projects-in-texas-302715699.html
  2. energiesmedia.com/sunraycer-texas-hybrid-solar-storage-600-mw/
  3. stocktitan.net/news/CSIQ/e-storage-and-sunraycer-announce-503-m-wh-battery-energy-storage-9j55acg7nnnh.html
  4. pv-tech.org/sunraycer-breaks-ground-620mw-solar-plus-storage-portfolio-us/
  5. renewablesnow.com/news/sunraycer-kicks-off-works-at-three-texas-solar-plus-storage-sites-1291510/
  6. pv-magazine-usa.com/2026/05/15/sunraycer-renewables-closes-901-million-financing-for-473-mwh-bess-portfolio-in-texas/
  7. indexbox.io/blog/sunraycer-renewables-secures-901m-financing-for-texas-solar-plus-storage-projects/
  8. interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-ad5

Commercial operation date: LBNL proposed COD of September 2026 aligns with March 2026 construction start announcements and typical 6-9 month solar+storage build timelines. No contradictory dates found in recent press coverage.

Developer: Multiple March 2026 press releases identify Sunraycer Renewables as the developer/owner breaking ground on Lupinus I & II projects in Franklin County, TX. LBNL filing entity 'Lupinus Solar 2, LLC' is the project-specific legal vehicle.

Status: LBNL IA execution date of March 4, 2025 confirmed by April 2025 interconnection.fyi update. Construction commenced March 17, 2026 per PR Newswire and PV Tech. Project financing closed May 2026 per pv magazine USA.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Lupinus Solar 3 is a proposed solar generation project located in Franklin County, Texas, within the ERCOT region. The development project, with a total capacity of 100.8 MW, is being developed by Lupinus Solar 2, LLC. It consists of 100.8 MW of solar photovoltaic generation.

The project is listed in the ERCOT interconnection queue as entry ERCOT-24INR0484, with a queue entry date of September 23, 2023. The proposed commercial operation date is September 21, 2026, and its interconnection agreement status is currently in the Facility Study phase. The point of interconnection is the 1794 Monticello Tap 138 kV. The project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jan 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Franklin

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Lupinus Solar 2, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

1794 Monticello Tap 138 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.