Longfellow BESS I (ERCOT-24INR0453) — Project Summary

Queue ID
ERCOT-24INR0453
Capacity
54.99 MW
Technology
Solar+Battery
Status
active
Location
Pecos, TX
Region
ERCOT
Developer
CENTURY GAS PROCESSING, LLC
IA Status
IA Executed

Longfellow BESS I

ERCOT-24INR0453BetaActiveBatteryBatteryERCOTLBNL + Live

54.99 MW generation in Pecos, TX · In queue since November 2022 · Proposed COD March 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

54.99 MW

Capacity

1

Components

Battery

4 years

In Queue

IA Executed

IA Phase

Signed Apr 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 5m

IA → COD

2y 11m

Total Duration

2y 5m

Construction75%
Queue EntryNov 7, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementApr 15, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2028-03-30

Queue history
24INR0453 · 42 monthly ERCOT reports, Apr 2023 – Sep 2026

Projected COD moved

5 times

Dec 2024 → Mar 2028

Net change

+39 months

first report to latest

Capacity

55 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 7, 2022
Facilities study approvedDec 17, 2025
Interconnection agreement signedApr 15, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Longfellow BESS I project is a proposed 54.99 MW battery storage project located in Pecos County, Texas. The developer is CENTURY GAS PROCESSING, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0453, with a queue entry date of November 7, 2022, and a proposed commercial operation date of November 30, 2026. The project's interconnection agreement status is currently in the Facility Study phase.

The project consists of a single 54.99 MW battery component. The point of interconnection is the 38431 TNCENTRY1_1 138 KV substation. The Longfellow BESS I project has appeared in recent news coverage regarding energy storage development in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Pecos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

CENTURY GAS PROCESSING, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

38432 TNCENTRY1_1 138 KV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.