Midnight Sun Energy Storage (ERCOT-24INR0442) — Project Summary

Queue ID
ERCOT-24INR0442
Capacity
510 MW
Technology
Battery
Status
active
Location
Crockett, TX
Region
ERCOT
Developer
Midnight Sun Energy Storage, LLC
IA Status
IA Executed

Midnight Sun Energy Storage

ERCOT-24INR0442BetaActiveBatteryERCOTLBNL + Live

510 MW storage in Crockett, TX · In queue since December 2022 · Proposed COD June 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

510 MW

Capacity

1

Components

Battery

3y 11m

In Queue

IA Executed

IA Phase

Signed Jul 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 7m

IA → COD

2y 11m

Total Duration

2y 7m

Construction75%
Queue EntryDec 7, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJul 14, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-06-29

Queue history
24INR0442 · 47 monthly ERCOT reports, Nov 2022 – Sep 2026

Projected COD moved

2 times

Dec 2025 → Jun 2028

Net change

+30 months

first report to latest

Capacity

510 → 524 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 7, 2022
Interconnection agreement signedJul 14, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
2028
Developer in saved assessment
Midnight Sun Energy Storage, LLC
From queue filing
Status at research time
IA Executed
Active in ERCOT queue with IA executed 2025-07-14; ercotqueue.com notes FIS pending; local reporting lists it among Crockett County BESS projects expected to be built.
Financing
Not recorded

Milestones in this assessment

IA executedJul 14, 2025

Interconnection agreement executed per LBNL queue data; ercotqueue.com lists the project as IA with FIS pending.

ercotqueue.com
COD target2028Latest in this assessment

Cleanview lists the 524 MW project as expected online in 2028.

cleanview.co
Research sources and reasoning (6 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0442/midnight-sun-energy-storage
  2. ercotqueue.com/project/24INR0442
  3. interconnection.fyi/project/ercot-24inr0442
  4. ercotqueue.com/developer/midnight-sun-energy-storage-llc
  5. ozonastockman.com/articles/1507/view/county-to-update-disaster-preparedness-plan
  6. interchange.puc.texas.gov/search/filings/?ControlNumber=35077&SortBy=ItemNumber&SortOrder=Descending

Commercial operation date: Cleanview states the project is "Expected online 2028," consistent with the LBNL proposed COD of 2028-06-29. No source indicates a different date.

Developer: All sources (ERCOT queue trackers, PUC filings) name only Midnight Sun Energy Storage, LLC. No parent or operating company was identified in the search results.

Status: LBNL shows an executed IA and active status. Interconnection trackers show it as active, and a local article lists it among expected projects. No evidence of construction start or withdrawal.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Midnight Sun Energy Storage, a proposed battery storage project with a total capacity of 510 MW, is located in Crockett County, Texas. The project, developed by Midnight Sun Energy Storage, LLC, is currently in the ERCOT interconnection queue as entry ERCOT-24INR0442, with a queue entry date of December 7, 2022. The proposed commercial operation date is June 29, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The project consists entirely of battery storage with a capacity of 510 MW. Midnight Sun Energy Storage has been the subject of recent news coverage, particularly regarding regulatory matters.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Crockett

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Midnight Sun Energy Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

6601 Rio Pecos 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
HORSCR_RN
POI Substation
Rio Pecos Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.