Black & Gold Energy Storage
203.83 MW storage in Menard, TX · In queue since July 2022 · Proposed COD July 2027
203.83 MW
Capacity
1
Components
Battery
4y 4m
In Queue
IA Executed
IA Phase
Signed Aug 2024
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 1m
IA → COD
2y 11m
Total Duration
2y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 6–18 months
Proposed COD: 2027-07-30
Projected COD moved
3 times
Dec 2024 → Jul 2027
Net change
+31 months
first report to latest
Capacity
255 → 204 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed with ERCOT
interconnection.fyiResearch sources and reasoning (3 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-24inr0386
- cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0386/black--gold-energy-storage
- interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-07-30. No news articles or press releases found that discuss this specific project's timeline, so LBNL remains the only source.
Developer: LBNL filing entity is 'Black & Gold Energy Storage, LLC'. No news coverage or corporate announcements found to identify a parent company or operating entity distinct from the filing LLC.
Status: LBNL shows 'active' status with IA executed on 2024-08-14. No news coverage found regarding construction start, financing, or other development milestones.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Black & Gold Energy Storage is a proposed 254.58 MW battery storage project located in Menard County, Texas. Developed by Black & Gold Energy Storage, LLC, the project consists entirely of battery storage. It is currently in the ERCOT interconnection queue as entry ERCOT-24INR0386, with a queue entry date of July 18, 2022, and a proposed commercial operation date of July 30, 2027. The project's interconnection agreement has been executed as of August 14, 2024.
The proposed project connects to the grid at the 6364 Yellow Jacket Sub 138kV point of interconnection. Black & Gold Energy Storage has been the subject of recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Menard
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Black & Gold Energy Storage, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
6364 Yellow Jacket Sub 138kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Black & Gold Energy Storage
Data-driven briefing on Black & Gold Energy Storage — fleet, generation, financial, and news signals.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage pipeline in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.