Photo BESS 3
100 MW generation in Uvalde, TX · In queue since July 2022 · Proposed COD September 2027
Withdrawn from the ERCOT queue in September 2026, according to ERCOT's queue (Oct 2026).
100 MW
Capacity
1
Components
Battery
4y 4m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Proposed COD: 2027-09-01
Project withdrew from interconnection queue
Projected COD moved
2 times
May 2024 → Sep 2027
Net change
+40 months
first report to latest
Capacity
100 MW
unchanged in the reports
Latest stage
Cancelled
last listed Aug 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Entered ERCOT queue at Facility Study stage
eta-publications.lbl.govResearch sources and reasoning (4 recorded sources)
low confidence at research time
- cleanview.co/planned-battery-projects/TX/24INR0380/photo-bess-3
- interconnection.fyi/project/ercot-24inr0380
- renewablesinfo.org/project/ercot-24inr0380-photo-bess-3
- eta-publications.lbl.gov/sites/default/files/2024-09/hybrid_plant_tracking_2024_data_workbook.xlsx
Commercial operation date: LBNL queue filing proposes September 2027 COD. No independent news or press releases found to confirm or update this target. Cleanview aggregator shows August 2027, likely derived from same LBNL source.
Developer: LBNL filing lists 'CED Development Inc.' as developer. No press releases, corporate announcements, or news coverage found to identify parent company or confirm operating entity. Name does not appear to be a project-specific shell LLC.
Status: LBNL status is 'active' at Facility Study stage. No news coverage or milestones found to indicate progression beyond interconnection studies.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Photo BESS 3 is a proposed 100 MW battery storage project located in Uvalde County, Texas. The project, developed by CED Development Inc., is interconnected within the ERCOT region and entered the interconnection queue as ERCOT-24INR0380 on July 25, 2022. The proposed commercial operation date is September 1, 2027, and the project's interconnection status is currently in the Facility Study phase.
The development has been mentioned in recent news coverage. The project consists of 100 MW of battery storage capacity.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Aug 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Uvalde
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
CED Development Inc.
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
5885 Downie Substation 138kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- HELIOS_RN
- POI Substation
- Downie Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Photo BESS 3Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.