Huisache BESS (ERCOT-24INR0376) — Project Summary

Queue ID
ERCOT-24INR0376
Capacity
100.67 MW
Technology
Solar+Battery
Status
active
Location
Wilson, TX
Region
ERCOT
Developer
Huisache Solar, LLC
IA Status
IA Executed

Huisache BESS

ERCOT-24INR0376BetaActiveBatteryBatteryERCOTLBNL + Live

100.67 MW generation in Wilson, TX · In queue since August 2022 · Proposed COD June 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

100.67 MW

Capacity

1

Components

Battery

4y 3m

In Queue

IA Executed

IA Phase

Signed Aug 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3 years

IA → COD

3y 10m

Total Duration

3 years

Construction75%
Queue EntryAug 5, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementAug 12, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2029-06-30

Queue history
24INR0376 · 45 monthly ERCOT reports, Dec 2022 – Sep 2026

Projected COD moved

2 times

Dec 2024 → Jun 2029

Net change

+54 months

first report to latest

Capacity

102 → 101 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 5, 2022
Interconnection agreement signedAug 12, 2025
On ERCOT's inactive listJun 2024 – Jun 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
2029
From queue filing
Developer in saved assessment
Novis Renewables
Filed as Huisache Solar, LLC
Status at research time
IA Executed
IA Executed — interconnection agreement with CPS Energy signed August 2025, FIS pending per ercotqueue.com
Financing
Not recorded

Milestones in this assessment

IA executedAug 12, 2025

Generation Interconnection Agreement executed with CPS Energy

interchange.puc.texas.gov
COD targetJun 2029Latest in this assessment

Target COD 2029 per ERCOT capacity tracking

ercot.com
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=35077&FilingParty=cps%20energy&DocumentType=ALL&SortBy=FilingParty&SortOrder=Ascending
  2. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
  3. ercot.com/files/docs/2026/01/08/Capacity-Changes-by-Fuel-Type-Charts_December_2025.xlsx
  4. ercotqueue.com/project/24INR0376

Commercial operation date: LBNL queue shows 2029-06-30 COD. ERCOT capacity charts from Nov/Dec 2025 confirm 2029 target. No press releases or news articles provide alternative dates.

Developer: LBNL filing entity is 'Huisache Solar, LLC' (project shell). May 2024 ERCOT buildout pipeline spreadsheet lists developer as 'Novis Renewables, LLC' for this project.

Status: LBNL shows IA executed 2025-08-12. Texas PUC filings confirm Generation Interconnection Agreement between Huisache Solar, LLC and CPS Energy. Project remains in pre-construction phase.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Huisache BESS project is a proposed 100.67 MW battery storage project located in Wilson County, Texas. Developed by Huisache Solar, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0376, with a queue entry date of August 5, 2022. The proposed commercial operation date is June 30, 2029.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is planned for tapping the Elm Creek to Shaula circuit 1. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Wilson

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Huisache Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tapping the Elm Creek to Shaula circuit 1

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.