Possum Kingdom BESS
200.86 MW generation in Jack, TX · In queue since September 2022 · Proposed COD October 2028
200.86 MW
Capacity
1
Components
Battery
4y 2m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 1m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-10-29
Projected COD moved
3 times
May 2026 → Oct 2028
Net change
+29 months
first report to latest
Capacity
201 → 201 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Standard Generation Interconnection Agreement filed between Oncor Electric Delivery Company LLC and PK Solar, LLC
interchange.puc.texas.govResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- cleanview.co/planned-battery-projects/TX/24INR0375/possum-kingdom-bess
- interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
- modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
- ercotqueue.com/project/24INR0375
Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-10-29. No independent news sources or press releases found to confirm or contradict this date. Cleanview aggregator mirrors the LBNL date.
Developer: LBNL filing entity is 'PK Solar, LLC' (project shell). AWS buildout pipeline (May 2024) identifies the operating developer as 'Novis Renewables, LLC', indicating PK Solar LLC is a project-specific SPV.
Status: LBNL shows 'active' with IA status 'Facility Study'. Ercotqueue.com claims 'Construction' status but provides no dated milestone or source. PUC filings show Standard Generation Interconnection Agreement activity through August 2025, consistent with pre-construction interconnection work.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Possum Kingdom BESS project is a proposed 200.86 MW battery storage project located in Jack County, Texas. The developer is PK Solar, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0375, with a queue entry date of September 2, 2022. The proposed commercial operation date is October 29, 2027, and the project's interconnection agreement status is currently in the Facility Study phase.
The project consists of 200.86 MW of battery storage capacity. The point of interconnection is Tap 345kV 1421 Willow Creek _x0013_ 11523 Thomas Price. The Possum Kingdom BESS project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Jack
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
PK Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 1421 Willow Creek – 11523 Thomas Price
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.